How to determine the building foorprint?CS-2009 SSc5.2: Site development - maximize open spaceposted by Gabriela Hernández Castillo on Feb 23, 2012, 3:27 pm
Our project is a building that literally crosses another building. It consists of a 40 stories building (the LEED building) that comes out of a 3 stories mall (not applying for certification.... Last reply: Tristan Roberts, Apr 5, 2012, 10:40 am |
|
Space Usage Type- TableGeneral forumsposted by Gail Vittori on Mar 2, 2012, 1:29 pm
Can anyone clarify if the column "Regularly Occupied Area" should correlate with "Regularly Occupied Spaces" as defined in EQc8: Views and Daylighting or should it be all occupy able space? Last reply: Emily Catacchio, Apr 5, 2012, 10:20 am |
|
The ITE Parking GenerationGeneral forumsposted by Nelina Loiselle on Mar 1, 2012, 6:56 pmEmily Catacchio Sustainability Specialist Wight and Company LEEDuser Basic Member 610 thumbs up April 5, 2012- 10:15 am The ITE Parking Generation Study is only used for SSc4.4, it should not influence your overal FTE. FTE should take into account number of opperation days and influx of transients, etc. Check out the Calculating FTEs forum here. Log in or register to post comments ... Last reply: Emily Catacchio, Apr 5, 2012, 10:15 am |
|
Option 1 and Option 2 Combined?EBOM-2009 SSc7.1: Heat island effect - nonroofposted by Jason McIntyre on Feb 28, 2012, 2:35 pm
I have a project that has a detached parking garage, of which has spaces on the top level (uncovered). I also have surface parking spaces on the site... So, I have covered spaces (37% of total),... Last reply: Emily Catacchio, Apr 5, 2012, 10:06 am |
|
Denial of PC9 for non-compliance w/ technical requirementsPilot-Credits PC9: Street Networkposted by Michael Miller on Sep 29, 2011, 11:05 am
We had registered our CI project for PC9 prior to the change to the credit that limited it to Homes projects. We just received our certification review, and the reviewer acknowledged we had done... Last reply: Clara Simon, Apr 4, 2012, 6:42 pm |
|
Negative Pressure Differential RequirementNC-2009 IEQc5: Indoor Chemical and Pollutant Source Controlposted by Maya Karkour on Jun 27, 2011, 3:55 am
Dear all, One of the credit requirements is that: Last reply: Dylan Connelly, Apr 4, 2012, 4:23 pm |
|
EAp2 option 2 vs EAc1 Option 3NC-2009 EAc1: Optimize Energy Performanceposted by Carl Sherman on Apr 4, 2012, 3:13 pm
If we use option 2 for EAp2 can we use option 3 for EAc1 or do we need to be consistant throughout? Last reply: Marcus Sheffer, Apr 4, 2012, 3:51 pm |
|
LEED BD+C Major Renovation or LEED EBOMLEED Rating System Selectionposted by Stéphane Paris on Mar 26, 2012, 1:16 pminstead. I hope that helps answer your question. Good luck. I know from my own experience that a project in Europe can be tricky. Be sure to check out the forum about ACP (Alternative Compliance Path... Last reply: Susann Geithner, Apr 4, 2012, 3:11 pm |
|
Mixed Use Building- What is Required for Fixtures?NC-2009 WEp1: Water Use Reductionposted by Melissa Wrolstad on Dec 21, 2010, 12:32 pm
Our project is a mixed use building where over 90% of square footage is residential and we are treating the Last reply: Michelle Rosenberger, Apr 4, 2012, 2:06 pm |
|
Does a crisis center require covered storage for bikes?NC-2009 SSc4.2: Alternative transportation - bicycle storage and changing roomsposted by Megan Dougherty on Apr 3, 2012, 1:34 pm
Our project is a crisis center which provides drop-in services and short term residential services. The drop in portion is considered an institutional project. Occupants can live in the... Last reply: Samantha Harrell, Apr 4, 2012, 1:46 pm |