Collected StromWater for irrigationEBOM-2009 SSc6: Stormwater Quantity Controlposted by Simon Sue on Sep 16, 2010, 2:34 am
Hi, Last reply: Tristan Roberts, Sep 16, 2010, 5:21 pm |
|
Solid Surface Materials; Quartz, Corian, etc. claiming RegionalNC-2009 MRc5: Regional Materialsposted by Jennifer Preston on Sep 14, 2010, 1:52 pm
We have recently had a material rep in our office claiming that Quartz can be used to contribute to regional materials because the local (within 500 miles)... Last reply: Tristan Roberts, Sep 16, 2010, 5:16 pm |
|
How to address area requirementsCS-2009 SSc7.2: Heat island effect - roofposted by javier bolanos zeledon on Sep 4, 2010, 8:32 am
Hi, Last reply: javier bolanos zeledon, Sep 16, 2010, 4:13 pm |
|
Project's lower roof shaded by elevated new constructionNC-2009 SSc7.2: Heat island effect - roofposted by Karen Hutcheson on Aug 25, 2010, 5:00 pm
Our project has an elevated second story over an existing ballasted roof (river rock). The new white roof membrane meets the credit requirement with an... Last reply: Tristan Roberts, Sep 16, 2010, 3:30 pm |
|
guide to formGeneral forumsposted by Tristan Roberts on Sep 16, 2010, 11:39 am
Robert, we don't have an example filled-out form, but there is a guide with some notes on our page of tipsheets. |
|
Exemplary Performance 2008 vs. 2009EBOM-2009 IOc1: Innovation in Operationsposted by Chris Munn on Sep 13, 2010, 7:07 pm
I understand that in LEED 2009 you can achieve up to 3 points for exemplary performance. How is this different from LEED 2008? I had a colleague achieve multiple exemplary performance credits... Last reply: Emily Catacchio, Sep 16, 2010, 11:28 am |
|
Registering ProjectsGeneral forumsposted by Elizabeth McPherson on Sep 8, 2010, 12:38 pm
The answer I got from USGBC was that if I am the Proj. Admin. (I am a consultant) and my company is a member, that is enough to get the discounted rate for my client. I am registering the... Last reply: Elizabeth McPherson, Sep 16, 2010, 10:46 am |
|
leaving them aloneGeneral forumsposted by Tristan Roberts on Sep 16, 2010, 9:46 am
I would say 'yes" to leaving them alone. What do you mean by checking them complete? That would imply to me that you've completed documenting them, which you haven't. |
|
IEQ Natural vs Mechanical VentilationNC-2009 IEQp1: Minimum indoor air quality performanceposted by Joseph Snider on Sep 13, 2010, 3:22 pm
We have a building that only has fan-assisted ventilation, meaning that there is no air-handler or ductwork - there are only exahust fans and air-movement fans in certain locations to move air in... Last reply: Tristan Roberts, Sep 16, 2010, 9:25 am |
|
what is scope of work?General forumsposted by Tristan Roberts on Sep 16, 2010, 9:12 am