Topic | Recent |
---|---|
Infiltration RatesNC-2009 EAp2: Minimum Energy Performanceposted by V. Miller on Nov 23, 2010, 8:37 am
I am wondering what the correct assumption should be an... Last reply: Marcus Sheffer, Dec 8, 2010, 11:23 am |
|
Ground-source heat pump and VRV- minimum efficiencyNC-2009 EAp2: Minimum Energy Performanceposted by Yuan Yuan on Nov 14, 2010, 10:23 pm
My project uses ground-source heat pump and also VRV system. However, there is no minimum efficiency requirement in ASHRAE 90.1 for them. How should I fill the ASHRAE compliance form. May I leave... Last reply: Marcus Sheffer, Dec 8, 2010, 11:10 am |
|
App G. 90.1- baseline system modelNC-2009 EAp2: Minimum Energy Performanceposted by Art Kamm on Nov 5, 2010, 9:20 am
We have a 2-story bldg. over 25,000 sq.ft. that has offices and anicllary spaces; one adjacent 2-story high theater; and one adjacent 2-story high Gym. We are modeling it as one HVAC... Last reply: Marcus Sheffer, Dec 8, 2010, 11:01 am |
|
WEp1- Local CodeCS-2009 WEp1: Water Use Reductionposted by Tapio Peltonen on Dec 7, 2010, 11:26 am
How to earn Water Use Reduction Points, when the local code requires e.g. minimum flow for Commercial lavatory faucets=1.6 gpm and over the baseline for other fixtures, too. Last reply: Tapio Peltonen, Dec 8, 2010, 10:50 am |
|
RE: LEED project boundary in campus settingGeneral forumsposted by Clint Newton on Dec 8, 2010, 10:45 am
It may help others to know that since this question was posted... |
|
Proposed changes to the LEED AP creditGeneral forumsposted by James Green on Dec 8, 2010, 10:43 am
How about a single point for LEED AP legacy and an additional point for specialties? |
|
GBCI rules it is 4 Categories, not 4 Items, and denies creditSchools-2009 WEc4: Process water use reductionposted by RETIRED on Feb 3, 2010, 7:07 pm
I recently had this credit denied by... Last reply: RETIRED, Dec 8, 2010, 10:43 am |
|
EAc1.3 and onsite renewablesCI-2009 EAc1.3: Optimize energy performance - HVACposted by Shannon Allison on Dec 2, 2010, 1:27 pm
Can we take credit for PVs? If so, how do you include the savings? If we include the PVs in our energy model, the savings is deducted from the total building end use. The LEED template table... Last reply: Paul Conrad, Dec 8, 2010, 10:14 am |
|
Energy Simulation for CICI-2009 EAc1.3: Optimize energy performance - HVACposted by Santhosh Manavalan on Nov 30, 2010, 4:21 am
My client is hiring only a small portion of the existing building, which is not LEED certified, and we are using the common central chiller of that building, but we have our own... Last reply: Paul Conrad, Dec 8, 2010, 10:07 am |
|
Does IEQp1 Case 2 qualify for this measure?EBOM-2009 IEQc1.2: Indoor air quality best management practices - outdoor air delivery monitoringposted by Laura Girard on Dec 3, 2010, 5:39 pm
Our contractor is telling us we can not meet 62.1-2007 because we do not have the chiller capacity, but we can meet the 10 cfm/person requirement of case 2. If we go this route, does this... Last reply: Laura Girard, Dec 8, 2010, 9:54 am |