Topic | Recent |
---|---|
LEED 2012 Sustainable Sites Rainwater ManagementGeneral forumsposted by Yew-Hoe Tan on Sep 9, 2011, 9:13 pm
While I appreciate the intent of trying to establish a baseline ecological state of the world prior to the discovery of the Americas, I think the "Pre-Columbian reference is unnecessary and... |
|
Small Sized printersCI-2009 IEQc5: Indoor Chemical and Pollutant Source Controlposted by Sundararaj Subburaman on Mar 16, 2011, 1:03 am
I am working on a CI project, which requires small sized printers to placed in the floor area for particular working groups, do we have to consider the small sized printers to be placed inside... Last reply: Daniela Castro Salgado, Sep 9, 2011, 6:10 pm |
|
100% Municipal Non-Potable WaterNC-2009 WEc1: Water Efficient Landscapingposted by Michelle Rosenberger on Sep 7, 2011, 1:36 pm
Our project will irrigate with a drip irrigation system using 100% municipally supplied non-potable water. The way I am reading this credit, we cannot get any points for using non-potable water... Last reply: Susann Geithner, Sep 9, 2011, 2:34 pm |
|
Which Waste Streams Should Be Included?NC-2009 MRp1: Storage and Collection of Recyclablesposted by Jane Long on Sep 8, 2011, 8:01 am
Hi All. Is this credit specifically for office waste or all waste streams? I’m working on a large industrial factory building, and whilst the operator has a policy of recycling... Last reply: Lisa Fabula, Sep 9, 2011, 1:42 pm |
|
Lighting Controllability in Restaurant Dining & Bar AreasNC-2009 IEQc6.1: Controllability of systems - lightingposted by Karla Fisk on Jul 26, 2011, 9:57 am
Has anyone ever had a restaurant NC project where you were able to come up with a method of controlling lighting in the dining/bar area? Last reply: Lauren Sparandara, Sep 9, 2011, 12:51 pm |
|
Low Emitting Interiors- Move HC only criteria to all BD&CGeneral forumsposted by Tom Lent on Sep 7, 2011, 8:32 pm
There are requirements in this credit that originated in LEED for Healthcare due to the extra concern about health in its development. They are, however, robust credits that could and arguably... Last reply: Dwayne Fuhlhage, Sep 9, 2011, 12:16 pm |
|
Industrial buildings: EAc1 Optimize Energy PerformanceCS-2009 EAc1: Optimize Energy Performanceposted by Jane Long on Apr 5, 2011, 9:36 am
Hi, I’m working on a pre-assessment for a large manufacturing (aircraft) plant. While a number of ‘reduction’ strategies are being considered, they do not represent a significant... Last reply: Jane Long, Sep 9, 2011, 11:42 am |
|
lavatory faucets with different flow rateCI-2009 WEp1: Water Use Reductionposted by Grace Ming on Aug 22, 2011, 6:52 am
Hello All, Last reply: Susann Geithner, Sep 9, 2011, 10:43 am |
|
In the past, the publishedGeneral forumsposted by David Posada on Jun 1, 2010, 3:46 pm
In the past, the published schedule for Design Phase preliminary review has been a minimum of 25 business days (about 5 weeks) and a minimum of 15 business days (3 weeks) for the Final Review.... Last reply: Susann Geithner, Sep 9, 2011, 10:16 am |
|
Most Appropriate SpecialtyGeneral forumsposted by Scott Dunning on Sep 8, 2011, 6:17 pm
I'd like to have a clear understanding of which specialty will be considered 'most' appropriate for any given project. Can a LEED AP+BD&C 'count' for a project pursuing LEED CI certification... |