Hi All.

Is this credit specifically for office waste or all waste streams?

I’m working on a large industrial factory building, and whilst the operator has a policy of recycling materials from the manufacturing process this is a very different process to the occupant-led recycling facilities and plan.

Would in internal layout drawing need to show the recycling areas on the factory floor?

Many thanks.

Kit