Process Costs Tables for C&SCS-2009 EAp2: Minimum Energy Performanceposted by Maya Karkour on Oct 19, 2011, 9:12 am
Dear all, I am modeling a C&S project (large shopping mall). For the process loads, I am using: Last reply: Marcus Sheffer, Oct 19, 2011, 10:03 am |
|
an update from February 2011CI-2009 IEQc5: Indoor Chemical and Pollutant Source Controlposted by Seonhee Kim on Apr 6, 2011, 3:03 pm
This is the updated portion of IEQ c5. In mechanically ventilated buildings, each ventilations systems that supplies outdoor air shall comply with the following: Last reply: Dylan Connelly, Oct 18, 2011, 6:38 pm |
|
Exhaust Rate of at least 0.5cfm/sq.ftNC-2009 IEQc5: Indoor Chemical and Pollutant Source Controlposted by Maya Karkour on Aug 1, 2011, 9:03 am
Hi All, Assuming that one of the hazardous chemical area also has a fresh air supply (in addition to the exhaust), how do we determine if the min exhaust rate (0.5cfm/sq.ft) is achieved... Last reply: Dylan Connelly, Oct 18, 2011, 6:29 pm |
|
Pilot Credit #45 is a very indepth site analysisPilot-Credits SSpc45: Site assessmentposted by Kendal Neitzke on Oct 18, 2011, 3:19 pm
Our project site has a development history going back to the mid-1800's which included a rather lengthy and involved brownfield remediation. Although the documentation for this credit required a... |
|
System status report for ventilation systemEBOM-2009 IEQp1: Minimum indoor air quality performanceposted by Sundararaj Subburaman on Mar 31, 2011, 7:44 am
We are pursuing LEED-EB:O&M for an office building. It has BAS functions for heating, ventilating, and air conditioning system. To comply with the prerequisite requirements, we... Last reply: Alexa Stone, Oct 18, 2011, 1:54 pm |
|
Definition of "Outdoor Air"NC-2009 IEQp1: Minimum indoor air quality performanceposted by James Chueh on Sep 27, 2011, 11:08 pm
We are seeking LEED NC certification in a high-tech manufacturing plant, and it is a normally practice to only use natural ventilation (louvers and openings to outside of the building) for spaces... Last reply: Roger Chang, Oct 18, 2011, 1:37 pm |
|
Are Form submetering requirements greater than Ref Guide?CI-2009 EAc3: Measurement and Verificationposted by Raphael Sperry on Sep 28, 2011, 4:19 pm
In Case 1 (project Last reply: Ante Vulin, Oct 18, 2011, 11:44 am |
|
Field PersonnelGeneral forumsposted by Emily Catacchio on Oct 17, 2011, 6:09 pm
In my opinion, yes. Though I have not used it specifically in the field. |
|
SSc6.1 Pond with Flow Restrictor and Total Stormwater VolumeNC-2009 SSc6.1: Stormwater design - quantity controlposted by Sandra Bauder on Oct 13, 2011, 9:32 am
I am having the same issue as Lucy (October 18, 2010) on one of our current projects, and the comments by Gregory and Jennifer were helpful but I still have some questions. Last reply: Sandra Bauder, Oct 17, 2011, 3:16 pm |
|
Can A Dormitory Count for the 10 Units per Acre Requirement?NC-2009 SSc2: Development Density and Community Connectivityposted by Landon Chapman on Oct 14, 2011, 4:42 pm
I've got all options satisfied for Option 2 but I'm having trouble with the 10 units per acre requirement. There is an existing dormitory within the 1/2 mile radius (and, in fact, my project is... Last reply: Patrice Coffman, Oct 17, 2011, 1:34 pm |