Dear all,

I am modeling a C&S project (large shopping mall).

For the process loads, I am using:
- For the Core Areas: ASHRAE 90.1 User's Manual - Page G32 - Table G-B
- For the tenanted areas: LEED Reference Guide - Page 616 - Table 1 (CS Appendix 2)

1) Is this correct?

2) Is it normal to have my process costs at ~14% based on these tables? I will upload a detailed table demonstrating how I got this 14% based on the references I listed above.

Many thanks,