Log in

4026 search results for "zero lot line"

Forum
Topic

BD&C Credit

EBOM-2009 IOc1: Innovation in Operations
posted by Marina Andrade on Dec 6, 2012, 12:23 pm

Nena, since EBOM SSc4 has a lot of points available with it, and basically is a performance-based incentive to increase use of alternative transport (the survey gives you credit for what you are doing, so...

Last reply: Tristan Roberts, Apr 19, 2013, 5:28 pm

Rainwater management

General forums
posted by Pamela Lippe on Dec 7, 2012, 3:31 pm

Theresa Backhus Sites Technical Specialist, LEED USGBC LEEDuser Premium Member 66 thumbs up December 7, 2012- 3:59 pm Hi Pamela, It is defined the same way as in the previous versions; the definitions have just moved to the online Glossary (while viewing each credit, you can "toggle" the glossary on or off). You can also view the full Glossary here: https://new.usgbc.org/glossary A path was actually created specifically for zero lot line projects in urban areas (3 points). The percentile of rain events threshold was lowered to the 85th percentile. The definition you mention above is for "...

Last reply: Scott Bowman, Dec 11, 2012, 8:28 am

Glare Control Type Question

Schools-2009 IEQc8.1: Daylight and views - daylight
posted by Ema S on Dec 13, 2012, 6:52 pm

windshields off cars in the parking lots. So a building may have exterior sun shades designed based on the sun path, but what do the occupants do when the sun is reflecting off a neighboring building or even...

Last reply: TODD REED, Dec 14, 2012, 2:59 pm

documentation guidance updated

EBOM-2009 SSc2: Building Exterior and Hardscape Management Plan
posted by Tristan Roberts on Feb 11, 2013, 2:48 pm

in LEEDUser's defense- you offer much more comprehensive guidance than the Reference Guide- there is zero guidance in there on how to track compliance with equipment which makes it seem a bit arbitrary...

Last reply: LUCY WILLIAMS, Apr 7, 2015, 12:20 pm

industrial project roof

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Emmanuel Pauwels on Feb 12, 2013, 2:07 am

daylighting strategies which, depending on their orientation, can provide some great reflective and indirect light into a space. To say that your daylight zone is the area that is defined by drawing a line...

Last reply: TODD REED, Feb 12, 2013, 10:41 am

No pope yet

General forums
posted by Tom Lent on Mar 19, 2013, 10:25 pm

(codes), to places that haven't yet adopted those standards. I see a lot of potential benefit in driving better practices into those places, and maybe LEED can extend its track record of doing a better job than protestors in picket lines have, at transforming business behaviors. Log in or register to post comments Hernando Miranda Owner Soltierra LLC LEEDuser Basic Member 344 thumbs up March 20, 2013-...

Last reply: Abena Darden, Mar 20, 2013, 2:29 pm

Discount Parking Rate

NC-2009 SSc4.3: Alternative transportation - low-emitting and fuel-efficient vehicles
posted by Norma Lehman on Mar 22, 2013, 10:16 am

Norma Lehman Principal The Beck Group LEEDuser Basic Member 133 thumbs up March 22, 2013- 10:44 am I might add that this campus does not have attendant or machine parking at the lots, all parking is by permit/sticker only, so i'm not sure the benefit of posting it at the entrance of the lots. Log in or register to post comments James Giannantonio Energy & Sustainability Analyst Johnson Controls, Inc. LEEDuser Basic Member March 22, 2013- 1:06 pm Hi Norma, I found an example that might be helpful for your research. The Kroc Center in Quincy, Illinois uses a parking sign in their parking lot to distinguish...

Last reply: Norma Lehman, Mar 29, 2013, 3:55 pm

Dedicated shuttle connecting to public transport interfaces

NC-2009 SSc4.1: Alternative transportation - public transportation access
posted by Ricardo Sá on Mar 25, 2013, 8:07 am

lines" because the shuttle is only one line even though it connects with bus interface with several bus lines and train station. Do you think it will be counted as one line only or it will guarantee full...

Last reply: Summer Minchew, Dec 17, 2015, 3:41 pm

Open grid pavement

NC-2009 WEc1: Water Efficient Landscaping
posted by Alicia Villanueva on Apr 8, 2013, 2:01 pm

Tristan Roberts Representative Vermont House of Representatives LEEDuser Expert 11477 thumbs up April 8, 2013- 2:10 pm Can you be more specific? Some open-grid paving has vegetation in it; some doesn't.The credit is looking at landscape area. Paved area is excluded. I think open-grid paving could go either way, depending, again, on specifics. Log in or register to post comments Alicia Villanueva CEO Revitaliza consultores LEEDuser Premium Member 76 thumbs up April 11, 2013- 11:11 am The open-grid pavement is in the parking lot. Log in or register to post comments Tristan Roberts Representative Vermont...

Last reply: Alicia Villanueva, Apr 11, 2013, 1:28 pm

Who can be the CxA?

CS-2009 EAp1: Fundamental Commissioning of Building Energy Systems
posted by Ron Dean on Apr 15, 2013, 7:25 pm

Then they can use those projects in the required on-line template to be the main CxA for projects from that point on. To my knowledge, and I am sure that someone else will correct me if I am wrong, the two...

Last reply: Scott Bowman, Apr 16, 2013, 3:32 pm