4026 search results for "zero lot line"
Topic | Recent |
---|---|
MERV13s on VAV boxesCI-2009 IEQc5: Indoor Chemical and Pollutant Source Controlposted by Michelle Rosenberger on Jul 24, 2012, 7:11 pmboxes. If not they need to start using them or you don't qualify for this credit. Adding MERV 13 filters to each VAV boxes is not standard practice and would require a lot of maintenance and expense.... Last reply: Dylan Connelly, Jul 25, 2012, 11:58 am |
|
ENERGY COST BUDGET METHOD, ENVELOPECI-2009 EAp2: Minimum Energy Performanceposted by TOMAS URIBE on Aug 14, 2012, 11:24 am2012- 3:14 pm Thanks a lot Marcus is very usefull your answer. I have a last question, I'm using the simulation method to met the prerequisite, but when I enter to the form of EAP2 in leedonline... Last reply: Marcus Sheffer, Oct 19, 2012, 3:48 pm |
|
COC Certification Required for GC...?NC-2009 MRc7: Certified Woodposted by Adrienne Lynn on Aug 16, 2012, 5:29 pmGeneral Contractors usually are the 'end-of-the-line' when it comes to the Chain of Custody- I.E. Even though the G.C. is modifying the FSC materials to install it, they are not selling it up... Last reply: Michelle Rosenberger, Oct 29, 2012, 1:53 pm |
|
Air recirculation and outdoor airNC-2009 EAc1: Optimize Energy Performanceposted by Francesco Passerini on Aug 17, 2012, 8:02 amam Design documentation. In naturally ventilated spaces (i.e. no fan powered ventilation at all) the mechanical OA rate is zero in both models. If the spaces are natural ventilation see the example... Last reply: Marcus Sheffer, Aug 17, 2012, 2:42 pm |
|
Permanent Irrigation System, Temporary Use of Potable WaterNC-2009 WEc1: Water Efficient Landscapingposted by Daniel Costantino on Sep 4, 2012, 1:46 pmTristan Roberts Representative Vermont House of Representatives LEEDuser Expert 11477 thumbs up September 5, 2012- 11:03 pm Daniel, I haven't heard this discussed before, but I imagine a lot of projects with this kind of system must face such a question. It seems to me that it falls squarely under the allowance of temporary irrigation for establishment of plants, and can be ignored, as it's... Last reply: Miles Thorne, Apr 16, 2015, 5:26 pm |
|
Commingled Waste DocumentationNC-2009 MRc2: Construction Waste Managementposted by Angie Allen on Sep 11, 2012, 2:55 pmto believe that GBCI expects that a "haul" of commingled waste be broken down so that each line item is a constituent part. For example, what could be listed as 10 Tons of 100% Mixed Recyclables... Last reply: Kris Phillips, Oct 10, 2012, 5:00 pm |
|
LPD and EA credit 1CS-2009 EAc1: Optimize Energy Performanceposted by Alex AC on Sep 19, 2012, 3:31 pmI hope everybody is having a great day! I came across this thread and a bunch of questions popped into my head. (Well, I´m new to the energy modeling business, so I always have questions I guess) In my case, I´m modeling a building 7 stories tall with a 4 level basement for parking. This is an office building. Nevertheless, I wonder if Standard 90.1 (Table 9.5.1) contemplates the idea of having parking lots for an office building. That is, does it mean that the 1.0 value of LPD listed there considers a building made up of office spaces only?. Im inclined to use Building Area Method because... Last reply: Marcus Sheffer, Sep 25, 2012, 3:34 pm |
|
Data Centers- Efficiency for UPS and computer servers for theNC-2009 EAp2: Minimum Energy Performanceposted by Carlos Garcia on Sep 25, 2012, 8:24 amand computer servers indicated in these documents for baseline simulation? If not, what is the efficiency for UPS´s and computer servers we should use in the baseline simulation for the data center? Thanks a lot... Last reply: Marcus Sheffer, Mar 12, 2013, 6:08 pm |
|
Modelling of Zone EquipmentNC-2009 EAp2: Minimum Energy Performanceposted by Jean Marais on Sep 26, 2012, 10:48 amthe model without compromising accuracy to a significant degree? In my experience there is a rather large grey area on this issue, not a thin line, and it varies on practically each model. Log in or register... Last reply: Marcus Sheffer, Oct 15, 2012, 2:38 pm |
|
Industrial machines are considered process energy?NC-2009 EAp2: Minimum Energy Performanceposted by Marcio Alberto Casado Pereira on Oct 16, 2012, 3:02 pmin or register to post comments Kath Williams LEED Fellow 2011, Principal Kath Williams + Associates LEEDuser Premium Member 147 thumbs up October 16, 2012- 4:50 pm Along this same line, our newest project... Last reply: Marcus Sheffer, Oct 16, 2012, 5:17 pm |