4027 search results for "zero lot line"
Topic | Recent |
---|---|
Parking garage... outside project boundaryEBOM-2009 SSc7.1: Heat island effect - nonroofposted by CY Ng on Aug 25, 2011, 3:56 aminterpretation. In my case, would an owner owned parking lot near the building butt outside the LEED Boundary need to be covered? Lets say, within my LEED Boundary there are only 50 spaces, all underground, and nearby but outside the LEED Boundary the owner owns a parking lot with 150 uncovered spaces. Would I need to cover 50 of those spaces to meet this credit? Or do I already meet the credit with 100%... Last reply: Tristan Roberts, Jul 9, 2012, 9:52 pm |
|
Blowout FixturesCS-2009 WEp1: Water Use Reductionposted by Luis Miguel Diazgranados on Aug 25, 2011, 3:39 pmapproach since you will still get water savings from your blow-out fixtures opposed to the zero savings that you would get if you followed the guidance and put both your baseline and proposed at 3.5 gpf.... Last reply: Sonrisa Lucero, Jan 4, 2012, 2:35 pm |
|
Keep VOC Content restrictions for interior wet applied productsGeneral forumsposted by Tom Lent on Sep 7, 2011, 1:29 amit exposes workers to an alkaline corrosive; we manage risk. In the case of chemicals management, that involves hazard communication, application of engineering controls and as a last line of defense utilizing... Last reply: Dwayne Fuhlhage, Sep 14, 2011, 1:10 pm |
|
Low Emitting Interiors- Move HC only criteria to all BD&CGeneral forumsposted by Tom Lent on Sep 7, 2011, 8:32 pmThe bottom line is that material selection criteria probably should all be moved to MR since they are probably best merged into one credit set to encourage joint assessment of overlapping and sometimes... Last reply: Dwayne Fuhlhage, Sep 9, 2011, 12:16 pm |
|
How about a SI / IP version? A Spanish one?General forumsposted by Ricardo Sobral on Sep 11, 2011, 12:32 pmto be finished. About the SI issue, yes you are right about the LEED-Online forms but, to my knowledge, in many Latin American countries most of the forms are filled in off-line, and then the LEED-AP or team... Last reply: Mike Barker, Sep 13, 2011, 10:45 am |
|
MR Credit- Environmentally Preferable Structure and EnclosureGeneral forumsposted by Keith Lindemulder on Sep 13, 2011, 5:13 pmAttributes (whew....MR 5."whatever" would be a LOT easier....) you'll notice that Bio-Based materials are specifically designated as "Structure and Enclosure" and NOT Non-Structural.... Last reply: Keith Lindemulder, Sep 15, 2011, 3:35 pm |
|
zoning requirement SSc5.2NC-2009 SSc5.2: Site development - maximize open spaceposted by Kathleen Burke on Sep 21, 2011, 1:09 pmOur project is located in a small, tight suburban lot. The only landscape requirements within the zoning information is that A) 5% of the parking lot must be landscaped, B) any retention areas must be landscaped (not within our site boundary) and C) the landscape setbacks must be landscaped (also not within our site boundary.) Basically our landscaped area = 20% of our parking lot paved area. We think this meets the requirement for SSc5.2, BUT are worried that LEED will make us use the 20% of the site area. Which we do not meet- we are currently landscaped 12% of our site area. But if we follow our 5%... Last reply: Ashley Hu, Nov 21, 2017, 8:58 pm |
|
Drawing the 1/2 Mile Radius for Community Connectivity CreditNC-2009 SSc2: Development Density and Community Connectivityposted by Joshua Bloom on Sep 26, 2011, 2:46 pmNorma Lehman Principal The Beck Group LEEDuser Basic Member 133 thumbs up September 26, 2011- 3:11 pm I use Google Earth to map the radius and services. The Ruler tools allows you to draw a 1/2 mile line from the project site. Drop and label pins at the project site and 1/2 mile radius. There are several icons available for various services if you like. I then take a screen shot of the site w/... Last reply: Christian Sinai, Oct 3, 2011, 7:33 pm |
|
Prefererd parking spaces in Valet Parking- Hotel projectNC-2009 SSc4.3: Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Arub Vijay on Oct 17, 2011, 9:37 amMember 6 thumbs up October 19, 2017- 3:25 pm I am working on a hotel project that has a surface valet parking lot for hotel guests' cars. The lot will provide several EV charging stations for electric... Last reply: Allison Smith, Oct 19, 2017, 4:55 pm |
|
LEED for Schools- Bike Lane Req. (Sorry for Cross Posting)NC-2009 SSc4.1: Alternative transportation - public transportation accessposted by Jean Marais on Nov 3, 2011, 4:42 amDaycare Center- Bike Racks on Lot Boundry My Bicycle Parking Racks are located on the Lot Boundry. On the otherside of the fence, through the always open gates is the public side walk. How should I (why should I) proove/plan "dedicated bike lanes in two directions". This came back as lacking the "site plan showing"...from the reviewers. There is a 20 m walk way to the main entrance from the racks. Please help. SSc4.1 ... Last reply: David Posada, Nov 14, 2011, 2:00 am |