4026 search results for "zero lot line"
Topic | Recent |
---|---|
Project vs Lighting boundaryNC-v4 SSc6: Light Pollution Reductionposted by Bill Swanson on May 17, 2017, 10:10 amparking lot in the NE corner of the property that we are excluding from the LEED boundary. We aren't doing any work on it but would be replacing the existing perimeter lighting to match the new site... Last reply: Kelli Kimura, Jan 12, 2024, 4:20 pm |
|
Buildable land calculationsNC-v4 LTc4: Surrounding density and diverse usesposted by Ricardo Sá on Jun 7, 2017, 9:41 am= total area of blocks and/or lots? Log in or register to post comments Emily Purcell Sustainable Design Lead CannonDesign LEEDuser Expert 369 thumbs up December 21, 2018- 10:23 am That's correct. Log... Last reply: Olga Yuil, Dec 21, 2018, 12:41 pm |
|
Exterior lighting not yet designedNC-2009 EAp2: Minimum Energy Performanceposted by Vassil Vassilev on Jun 27, 2017, 4:20 amGreetings, The project we are modeling at the moment is supposed to have exterior lighting for the facades, some parking lots and some walkways. The exact LPD however is still to be calculated and will be ready at a later stage. The question is: Should we apply the LPD as per the standard to the Proposed and to the Baseline (equal values) or there are some other rules. Your advice is highly appreaciated as allways. Thanks. EAp2 Russia ... Last reply: Marcus Sheffer, Jun 27, 2017, 10:23 am |
|
Commuter RailNC-v4 LTc5: Access to quality transitposted by Brightworks Sustainability on Jul 11, 2017, 5:00 pmHi all, what qualifies transit options as having commuter service only? My project is located near a train station that is mainly used for commuting, but we also have 2 bus lines with about 30 trips... Last reply: Petra Holoubkova, Mar 21, 2022, 8:37 am |
|
Credit Make-up Air UnitNC-2009 EAp2: Minimum Energy Performanceposted by John on Aug 9, 2017, 12:15 amThanks a lot. Log in or register to post comments ... Last reply: John, Aug 10, 2017, 11:38 pm |
|
Some questions about temporary parking spacesNC-v4 LTc7: Reduced parking footprintposted by Jianzhushe Lili's on Sep 7, 2017, 4:22 amMember October 9, 2017- 6:19 am Thanks a lot for your reply. It would be helpful. Log in or register to post comments ... Last reply: Jianzhushe Lili's, Oct 9, 2017, 6:19 am |
|
Low-Impact Development strategy- Rainwater harvest+dry-wellsNC-v4 SSc4: Rainwater managementposted by Claudio Bonalda on Sep 20, 2017, 8:21 amDear all, I am working on a project (NC-V4, not zero-lot line) with a rainwater harvest for flushing toilets and for irrigation. The harvest capacity is about the 20% of the run-off volume, while the rest is managed through a dry-wells system (after a contaminant and pollutant cleaning treatment). As a result, all the run-off volume goes into the aquifer and nothing goes into the urban sewerage. Could the combination of rainwater harvest and dry-wells be considered as a Low-Impact Development strategy? I took a look on EPA website, but I haven't found any clarification about it. Thanks,... Last reply: Claudio Bonalda, Sep 21, 2017, 3:32 pm |
|
Verified Construction & Demolition Recycling Rates PilotPilot-Credits MRpc87: Verified Construction & Demolition Recycling Ratesposted by Juliana Moreira on Sep 27, 2017, 6:52 amwith this pilot credit using PAS 402? We are also looking at this credit on a few projects in the UK using facilities certified under PAS 402 or the Carbon Trust Zero Waste To Landfill Certification. Any feedback... Last reply: Juliana Moreira, Feb 1, 2018, 3:29 am |
|
Full spread vs non-full spread adhesives and sealants.NC-v4 EQc2: Low-emitting materialsposted by Dalton Ho on Oct 17, 2017, 3:18 pmJust noticed this line while reading the reference guide for the 10,000th time and it may have been overlooked by me previously, looking for any other thoughts/experiences/suggestions. Under "Changes from LEED 2009" it states that "emissions requirements for on-site, wet-applied, full-spread products... are now included. VOC content limits for on-site, wet-applied products are still required" This implies to me that "non-full" spread interior on-site, wet-applied products, may have been exempt from the General Emissions evaluation criteria. What is the definitition... Last reply: Joanna Switzer, Dec 19, 2017, 1:36 pm |
|
Pilot Credit- Green TrainingNC-v4 INc1: Innovationposted by Philippa Cameron on Oct 18, 2017, 8:06 amup February 4, 2020- 3:26 pm With the lovely, ahem, new format of the LEED credit library lots of stuff is lost or misplaced. The Resources tab only includes the spreadsheet for credit documentation... Last reply: emily reese moody, Feb 6, 2020, 10:49 am |