LEED Group project - Lighting Boundary

NC-v4 SSc6:Light pollution reduction
posted by  Edgar Arevalo  on 

I have a LEED Group project where I am pursuing the Light Pollution Reduction credit.  I have a concern regarding the lighting project boundary for a LEED Group site.

8
Mon Mar 9, 2026, 10:10 pm

LEED v4 ID+C – Baseline Envelope Clarification (ASHRAE 90.1-2010)

CI-v4 EAp2:Minimum energy performance
posted by  Sen Abraham  on 

Hello,

We are working on a LEED v4 ID+C office fit-out project with no envelope modifications — the envelope is entirely outside our scope of work.

1
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4460 thumbs up
Mon Mar 9, 2026, 8:43 pm
1
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4460 thumbs up
Mon Mar 9, 2026, 8:31 pm
2
Default Avatar
president
Gilleran Energy Management, Inc.
LEEDuser Premium Member
18 thumbs up
Mon Mar 9, 2026, 5:51 pm

Soil Testing

NC-v4.1 SSc2:Protect or Restore Habitat
posted by  Max Krueger  on 

On page 49 of the LEEDv4.1 guide it states that soil testing is only needed on imported soils. Under Step-by-Step guidance, it states "Soil tests are only required for imported soils".

8
Consultant
Sustainable Design Consulting
LEEDuser Premium Member
0 thumbs up
Mon Mar 9, 2026, 5:44 pm

Integrative Analysis of Building Materials

Pilot-Credits MRpc103:Integrative Analysis of Building Materials
posted by     on 

The project team is pursuing this pilot credit after achieving BPDO EPD and HPD credits.

12
Default Avatar
Sustainability Consultant
Mead & Hunt
LEEDuser Premium Member
0 thumbs up
Mon Mar 9, 2026, 1:30 pm
2
Sustainability Consultant | Senior Project Manager
Re:Vision Architecture
LEEDuser Premium Member
10 thumbs up
Fri Mar 6, 2026, 8:12 pm
1
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4460 thumbs up
Tue Mar 3, 2026, 2:44 pm

Credit Substitution Point Mismatch

NC-v4.1 SSc4:Rainwater Management
posted by  Grace Friedhoff  on 

We are registered as a v4 project but would like to substitute the Rainwater Management credit for version 4.1. However the credit thresholds do not update in LEEDonline when you substitute.

2
Sustainability Consultant | Senior Project Manager
Re:Vision Architecture
LEEDuser Premium Member
10 thumbs up
Fri Feb 27, 2026, 6:08 pm

Pilot Credit 87 - Verified Construction and Demolition Rates

Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Rates
posted by  Patty Lloyd  on 

Documentation of this credit was easy because we are using a hauler who has a CORR certified facility that is near to our job.  We tried this pilot credit once before and did not achieve it be

7
Senior Consultant
Greenwood Consulting Group
LEEDuser Premium Member
4 thumbs up
Thu Feb 26, 2026, 8:55 pm