single or multi-zone?
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Guilherme Ramos on
Our building is fully occupied by the same company, so all the floors have similar open space layout, except for enclosed managers or small meeting rooms. There´s an outside air intake in each AHU
Minimum Ventilation Rate Compliance
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Kevin Aisawa on
Hello,
DOAS DCV Ventilation Requirements
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Kevin Aisawa on
Hello,
IEQp1 form - Selecting Critical Zones
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Madushan Samarakoon on
How to answer the following requirement in the IEQp1 form when you already filled the Minimum IEQ perfromance calculator with all occupiable zones in it and it has already automatically selected th
Demand Control Ventilation (DCV) Compliance Documentation?
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Robert Pickering on
We are working on certifying a building that has demand-controlled ventilation (DCV), controlled by CO2 sensors.
Physical constraints
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Gustavo De las Heras Izquierdo on
Hallo, I am wondering what is the Reference Guide referring to when it says "physical constraints of the existing ventilation system".
Unable to Meet Pre-req during Current Performance Period
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Kristofer Kiszynski on
I was wondering what would happen if we failed to meet a prerequisite such as IEQp1. Would we need to restart our performance period after correcting whatever it is that needs to be corrected?
Case 2
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by AAME User on
If the 62MZ calculator reveals that the critical zone is a zone with cooling only (with a min of 0), is that an appropriate reason to pursue Case 2?