Post a question or comment
Credit Filters
Stormwater Design—Quality Control
Filter by location
Forum
Topic
Replies
Recent

TSS vs. SSC

posted by  Melissa Wrolstad  on 
1
Wed Feb 9, 2011, 12:54 am

Site Area as it relates to 6.2

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Anthony Venafro  on 

Can we eliminate site area to be dedicated for the computations for 1" of rainfall? i.e. existing site area is 5 acres witih a 1" volume of 14,000 cf.

1
Tue Mar 12, 2013, 6:29 pm

parking rainwater

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  jorge calderon  on 

For table SSC6.2-1, we dont know how to describe BMP neither its TSS removal efficiency, because the rain water from the parking is directed and collected to be sent to a vegetated site outside the

1
Wed Jul 2, 2014, 12:42 pm

retention basin and infiltration on site

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Adrienn Gelesz  on 

I am a little confused: The reference guide states that average TSS removal of an infiltration basin is 75% (50-100%).

1
Mon Jul 1, 2013, 4:51 pm

Reduction of impervious area

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Danielle Spicer  on 

I have a project where we are promoting infiltration by installing permeable pavers for a portion of the pavement, and we are capturing and treating runoff from 90% of the average annual rainfall e

1
Thu Feb 5, 2015, 3:46 pm

Calculating 90% rainfall compliance

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Simon Sue  on 

We're currently working on a high-rise commercial building, and hope someone could shed some lights on the following questions: 1.

1
Tue Dec 6, 2011, 5:35 pm
1
Wed Aug 25, 2010, 5:59 pm

City Stormwater Filtration

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Joel Cesare  on 

Most of the stormwater runoff on our site will be directed to the city drain intake, which reportedly is equipped with enhanced filtration. Can this be used for BMP?

1
Fri Mar 16, 2012, 8:02 pm

LEED Documentation - is it required for this point

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Kelley Howell  on 

Our project approach to this point is pretty straightforward. We are using a water quality structure with a sand filter for the entire site.

1
Sat Apr 23, 2011, 9:48 pm

percentage versus actual TSS number

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Adrienn Gelesz  on 

Hi! Does anyone know how to convert remaining g/l data into percentage data?

1
Fri Sep 14, 2012, 11:21 am