Can we eliminate site area to be dedicated for the computations for 1" of rainfall? i.e. existing site area is 5 acres witih a 1" volume of 14,000 cf. 0.5 acres will be dedicated to state use for roads. Can I assume if we capture the 1" (12,000 cf) from the resultant area of 4.5 acres we are ok?