Project boundary

NC-2009 PIf2:Project Summary Details
posted by  Nick Toon  on 

Hi, we are building an airport under new construction (2009).

3
Tue Mar 30, 2021, 11:51 pm

Changing Total Gross Floor Area in PIf2 during Preliminary Design Review

NC-2009 PIf2:Project Summary Details
posted by  Edgar Arevalo  on 

I'm currently going through the preliminary design review credits, and I was stumped on the comment for IEQp1: Minimum Indoor Air Quality Performance surrounding the 40,198 sq. ft.

1
Fri Jun 5, 2020, 4:41 pm

Change LEED boundary after Design Review?

NC-2009 PIf2:Project Summary Details
posted by  Joyce Kelly  on 

LEED boundary encompassing 130 acres was established by Civil to include all stormwater treatment. Following Prelim.

2
Sustainable Design Leader
HKS, Inc.
LEEDuser Premium Member
40 thumbs up
Tue May 5, 2020, 6:49 am

Existing Building Fire Escapes - Building Square-footage

NC-2009 PIf2:Project Summary Details
posted by  Katherine Norris  on 

Our existing building relies on (2) metal fire escapes for emergency egress that we are not modifying.  They are full exterior, self supported, and only connect to the building with later

1
Wed Aug 7, 2019, 5:18 pm

PI Form 2 Estimated project budget

NC-2009 PIf2:Project Summary Details
posted by  Brian Durgin  on 

Our project consist of multiple buildings on a large site, well our LEED Boundary only includes the main building and surrounding site area.

1
Fri Jan 11, 2019, 6:33 pm

Emergency Generator

NC-2009 PIf2:Project Summary Details
posted by  Nicole Kimoto  on 

In our new facility we have an emergency generator that runs on diesel.

4
Thu Aug 23, 2018, 3:28 pm

Parking Area Square Footage

NC-2009 PIf2:Project Summary Details
posted by  Jim Pugh  on 

With respect to calculating the "Square footage of all parking areas" . . .

1
Fri Jul 27, 2018, 5:01 pm

Reapplying for credits

NC-2009 PIf2:Project Summary Details
posted by  jupiter luner  on 

We're getting ready to move onto construction phase.

1
Wed Jun 20, 2018, 3:16 pm
2
Managing Partner
Ecoimpact Consulting
LEEDuser Expert
171 thumbs up
Fri Feb 23, 2018, 11:20 pm