Post a question or comment
Credit Filters
Minimum energy performance
Filter by location
Forum
Topic
Replies
Recent

50% of Receptable Controls to meet the Prerequisite

NC-v4 EAp2:Minimum energy performance
posted by  Kritika Kharbanda  on 

We are working on a project where it was missed during equipment procurement that open office furniture is required to have 50% of the receptacles controlled to meet the prerequisite under 90.1-201

1
Senior Energy Wizard
TLC Engineering Solutions
LEEDuser Premium Member
44 thumbs up
Mon Apr 13, 2026, 11:55 pm
3
Mon Mar 30, 2026, 12:22 pm
1
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Wed Mar 25, 2026, 3:45 pm
7
Default Avatar
president
Gilleran Energy Management, Inc.
LEEDuser Premium Member
18 thumbs up
Thu Mar 19, 2026, 10:45 pm
3
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Wed Mar 11, 2026, 2:36 pm

Baseline Energy Model - Outside Air Ventilation Rate for Zoo Spaces

NC-v4 EAp2:Minimum energy performance
posted by  Mini Laird  on 

We would like to confirm our approach to determining the outside air ventilation rate for a Zoo project for the Baseline energy model, specifically for an animal holding area.

1
Fri Jan 30, 2026, 4:22 pm
7
Fri Jan 30, 2026, 4:16 pm
3
Fri Jan 30, 2026, 3:33 pm

ASHRAE 90.1 mandatory requirement for daylight dimming not met in many projects

NC-v4 EAp2:Minimum energy performance
posted by  TANVEER ANSARI  on 

Hi,

We have been facing this problem on each and every new project in the region.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Mon Dec 15, 2025, 9:24 pm