Forum quick links
ASHRAE 90.1 mandatory requirement for daylight dimming not met in many projects
NC-v4 EAp2:Minimum energy performanceposted by TANVEER ANSARI on
Hi,
We have been facing this problem on each and every new project in the region.
Natural Gas as process loads
NC-v4 EAp2:Minimum energy performanceposted by A&L SUSTENTABILIDADE on
Dear forum users,
We are modeling a manufacturing building that uses natural gas in its welding processes.
Should the natural gas consumption be included in the energy simulation?
Baseline for Residential mixed use
NC-v4 EAp2:Minimum energy performanceposted by Vassil Vassilev on
Greetings,
Minimum Energy Performance - Manufacturing Facility & Process Loads
NC-v4 EAp2:Minimum energy performanceposted by Lorenzo De Donatis on
Hi,
We are evaluating the feasibility of meeting Minimum Energy Performance requirements for a New Construction under LEED v4 or v4.1.
Baseline Required Outdoor Airflow for Toilets
NC-v4 EAp2:Minimum energy performanceposted by Junaid Mujahid on
Hi Forum Users!
Clarification on Baseline System Type and Exceptional Calculation for Phased Data Center Project
NC-v4 EAp2:Minimum energy performanceposted by Anurag Ghosh on
Dear Forum Members,
Where should Covered parking goes in exterior lighting format
NC-v4 EAp2:Minimum energy performanceposted by Rajat Wadhwa on
Hi,
I am working on a LEED project and I am confused as to Where should Covered parking goes in exterior lighting format.
Baseline HVAC Modelling - System 8, Electric Resistance Heating, and Heat Recovery (ASHRAE 90.1‑2010 Appendix G)
NC-v4 EAp2:Minimum energy performanceposted by Anurag Ghosh on
Hi All,
We are modelling a commercial tower under ASHRAE 90.1‑2010 Appendix G. The proposed design includes:
Regd. Primary Secondary Pump Arrangement in PRM Baseline System 8 Modelling
NC-v4 EAp2:Minimum energy performanceposted by Anurag Ghosh on
Hello All,
Baseline system for spaces served by Make up air unit with gas heat
NC-v4 EAp2:Minimum energy performanceposted by Rajat Wadhwa on
Hi , I am working on a 100, 000 sqft office building with 50% of the spaces being storage which are served by MAU with gas heat, looking at the baseline system it comes with system 5 VAV with rehea