By submitting your email, you gain access to hundreds of BuildingGreen articles about green building and innovations and agree that BuildingGreen may send you communications with updates about sustainable design and construction. You may unsubscribe at any time. Terms and Conditions and Privacy Policy apply.
Your email address is safe with us
Thousands of architects, designers, and engineers trust our research and advice... you can trust us with your email address.
BuildingGreen will never share or sell your contact information.
Your email address is safe with us
Thousands of LEED professionals trust our research and advice... you can trust us with your email address.
LEEDuser will never share or sell your contact information.
Loading, please wait a moment...
destination: /, mode: buy
You already have a BuildingGreen account — please enter your password:
Your reset password email has been sent.
Click here to send a password reset link to
Loading...
You are already entitled to LEEDuser premium access through .
To get started, create a personal profile. This will give you full access to LEEDuser Premium through .To get the free reports, please create a personal profile
Loading...
Create your account to join
The most trusted voice in sustainable architecture and design
For more than 25 years BuildingGreen has never accepted ads or sponsorship, making us an unbiased resource you can count on.
“I’ve relied on BuildingGreen for over a decade—it’s one of the most reputable sources for cutting edge green building news & product research.’
—Mara Baum, Sustainability Director, HOK
Thank you for signing up for LEEDuser
IMPORTANT: Please check your email to verify your account.
You are now part of ’s group.
Watch your email for tips from our experts on getting the most from LEEDuser.com.
Here are three special reports you can use today:
Can We Replace Foam Insulation? – There are a lot of reasons to avoid foam, but its high performance can make it a hard habit to kick, as designers are finding out.
How WELL Got Green Building’s Groove Back – WELL is the hottest four-letter word in sustainable design. But will it work to the benefit or the detriment of green building?
20 Ways to Advance Sustainability in the Next Four Years – In this age of political revolution and environmental urgency, it’s time to step back and take a look at priorities, challenges, and opportunities. Here’s our founder Alex Wilson’s take on the best ways to advance sustainability.
Jobsite safety meetings or regular subcontractor meetings are a good place to educate your construction team about LEED requirements for IAQ management, as well as other related requirements for construction waste management, low-emitting materials, and other similar issues.
The requirements of this credit apply to all spaces within the building envelope. This credit does not differentiate between regularly occupied and non-regularly-occupied spaces.
Require that your contractor submit an IAQ Management Plan early in construction, before interior work has begun. The plan should detail the approach to this credit, as well as IEQc3.1 if both credits are being pursued.
Consider whether your HVAC system will be able to power a flush-out while maintaining temperature and humidity levels during seasonal extremes in a timely fashion, without major scheduling impacts. A total of 14,000 cubic feet of outside air must be exchanged for every square foot of floor area. The amount of outside air prescribed during a phased flush-out (0.3 CFM) may be several times greater than the normal rate required for a project’s occupancy, based on ASHRAE 62.1-2007, as required by IEQp1: Minimum IAQ Performance.
Many teams consider Option 1, but ultimately choose Option 2 for one of two practical reasons:
Scheduling the flush-out is not possible.
The building’s HVAC will not be able to maintain the required temperature and humidity levels for the duration of the flush-out. Doing so will also be energy-intensive.
If you follow the flush-out procedures required under Option 1, you will earn this credit, while if you follow the testing procedures under Option 2, you may earn the credit if your project passes the tests. This lack of certainty under Option 2 leads many project teams to pursue Option 1.
For projects with more than one main entrance, you may draw a circle from more than one entrance. The area contained within the circles drawn from all these radii is then used as your project’s radius.