Many teams consider Option 1, but ultimately choose Option 2 for one of two practical reasons:
- Scheduling the flush-out is not possible.
- The building’s HVAC will not be able to maintain the required temperature and humidity levels for the duration of the flush-out. Doing so will also be energy-intensive.