Pursuing this credit through Option 2: Air Testing can allow for an earlier move-in date than might be possible when pursuing a building flush-out. IAQ testing can be a quicker process if your project team can ensure that the air contains very little cont

Pursuing this credit through Option 2: Air Testing can allow for an earlier move-in date than might be possible when pursuing a building flush-out. IAQ testing can be a quicker process if your project team can ensure that the air contains very little contamination at the time of testing. However, there is always a risk of failing the test, which results in the need to flush-out the building again and retest—or forfeit the credit. 