By submitting your email, you gain access to hundreds of BuildingGreen articles about green building and innovations and agree that BuildingGreen may send you communications with updates about sustainable design and construction. You may unsubscribe at any time. Terms and Conditions and Privacy Policy apply.
Your email address is safe with us
Thousands of architects, designers, and engineers trust our research and advice... you can trust us with your email address.
BuildingGreen will never share or sell your contact information.
Your email address is safe with us
Thousands of LEED professionals trust our research and advice... you can trust us with your email address.
LEEDuser will never share or sell your contact information.
Loading, please wait a moment...
destination: /, mode: buy
You already have a BuildingGreen account — please enter your password:
Your reset password email has been sent.
Click here to send a password reset link to
Loading...
You are already entitled to LEEDuser premium access through .
To get started, create a personal profile. This will give you full access to LEEDuser Premium through .To get the free reports, please create a personal profile
Loading...
Create your account to join
The most trusted voice in sustainable architecture and design
For more than 25 years BuildingGreen has never accepted ads or sponsorship, making us an unbiased resource you can count on.
“I’ve relied on BuildingGreen for over a decade—it’s one of the most reputable sources for cutting edge green building news & product research.’
—Mara Baum, Sustainability Director, HOK
Thank you for signing up for LEEDuser
IMPORTANT: Please check your email to verify your account.
You are now part of ’s group.
Watch your email for tips from our experts on getting the most from LEEDuser.com.
Here are three special reports you can use today:
Can We Replace Foam Insulation? – There are a lot of reasons to avoid foam, but its high performance can make it a hard habit to kick, as designers are finding out.
How WELL Got Green Building’s Groove Back – WELL is the hottest four-letter word in sustainable design. But will it work to the benefit or the detriment of green building?
20 Ways to Advance Sustainability in the Next Four Years – In this age of political revolution and environmental urgency, it’s time to step back and take a look at priorities, challenges, and opportunities. Here’s our founder Alex Wilson’s take on the best ways to advance sustainability.
A project pursuing the Exemplary Performance credit for doubling transit ridership need to note that for this credit "transit rides" is defined as the number of times per day a bus or train stops at that particular stop. A combination of rail and bus lines is allowable.
Appendix A of the Recertification Guidance shows how projects certified under LEED-EB v2.0 can make the transition to LEED 2009, and how compliance with SSc1 can be achieved. The matrix shows the credits that are likely to require significant updates to comply with v2009 requirements and thresholds, versus those that will need minor adjustments. See the guidance for more information on how EB v2.0 projects can comply with SSc1.
If following Option 2 - Stream Channel Protection, don’t forget to provide a narrative describing the project’s site conditions, measures taken, and controls implemented to prevent excessive stream velocities and associated erosion.
Submetering at the space level will not help a project building achieve WEc1 Option 2 for submetering. Qualifying types of submeters for this credit include irrigation, indoor plumbing fixtures/fittings, cooling tower water, domestic hot water, or process water use.
Track all energy efficiency measures implemented and their associated (or anticipated/projected) energy savings. Convert these savings into emissions to document emissions reductions.
Vendors are critical to achieving this credit. Make sure the vendors are up to speed on the requirements. Moreover, have a check-in each time the pest vendor visits the building to ensure best practices are being followed.