If moving into an existing building, it may contain asbestos or other contaminants that need to be remediated. Investigate and address any contamination and remediation issues early in the planning process. Doing so can contribute to earning SSc1, Option 2, Path 1.
The contractor is the signatory for IEQc5, even though it's a design credit. Have the contractor review 100% of the construction documents to confirm compliance before completing the design submittal. Otherwise, the credit may have to be deferred until the construction submittal.
When planning for space allocation to meet credit requirements, consider strategies like merging exhaust systems into a single, main, designated exhaust, or stacking chemical use areas over each other on different floors to minimize ductwork.
Entryway systems should be climate-specific. For example, regions with high rainfall may choose high void-volume mats—for trapping dirt below the mat surface and fast drying. In regions where mud and snow are a greater source of contaminants, open-loop entry mats may be more appropriate.
While roll-off mats are acceptable, additional documentation (service contracts and schedules) is required to confirm that the mats will be cleaned on a weekly basis. They cost more up-front, but permanent entryway systems provide better performance, require less maintenance, and are easier to document for LEED compliance.
If you can use radiant heating and cooling for space conditioning and separate that function from ventilation, you’ll be moving a lot less air and meeting the MERV 13 requirement won’t be nearly as big a deal, due to fewer and smaller ducts and filters.
The LEED Reference Guide states that entryway systems need to be on the interior of the building or in an interior vestibule. It is recommended that projects pursuing this credit with the intent of using an exterior entryway system (either permanent or rollout) consult the