Log in

Hot Tip

An M&V program generally includes both sensors—which measure the energy volume and rate of flow, watts of energy draw, temperature, length of time, and other variables—and a central processor, which stores the collected information and helps building

An M&V program generally includes both sensors—which measure the energy volume and rate of flow, watts of energy draw, temperature, length of time, and other variables—and a central processor, which stores the collected information and helps building managers interpret it. A BMS typically includes the central processor needed for M&V, but not all of the sensors or additional programming to tally energy use and track patterns. However, adding these pieces to a BMS should pose little difficulty.

Introduce the M&V program early in the design process because it can affect the design of mechanical and electrical systems, the cost of the program, as well as the building management system. Designers should think ahead about how systems will be mon

Introduce the M&V program early in the design process because it can affect the design of mechanical and electrical systems, the cost of the program, as well as the building management system. Designers should think ahead about how systems will be monitored. There is also inherent value in having your design team think early on about how the project building will operate.