Keep all product cut sheets until the project has been certified, as there is a small chance that you will need to upload these to prove credit compliance if you are audited.
It is usually a good idea to do a “mini air flush” (if your project is not attempting EQc3.2) before occupancy to help remove any lingering VOCs from the construction process. This can be as simple as putting industrial sized fans in the window and pumping in fresh air overnight or running the HVAC exhaust on high for a few days. (See EQc3.2: Construction Indoor Air Quality Plan—Before Occupancy if the team wants to do a full flush-out for an additional LEED point.)
Schedule the application of paints and coatings so that off-gassing does not contaminate other absorptive materials. This is required if projects are attempting EQc3.1: Construction Indoor Air Quality Plan—During Construction. For example, do not store or install acoustic ceiling tile before flooring and wall paints are put down, because ceiling tiles will absorb the off-gassing of paint and contaminate the air over a longer time period.
Streamline documentation and research by keeping a master spreadsheet of all the items being tracked for each material across MR and IEQ credits. For example, you may need to ask the millworker for regional information for MRc5, certified
Keep all product cut sheets until the project has been certified, there is a small chance that you will need to upload these to prove credit compliance after a review.
It is usually a good idea to do a “mini air flush” (if your project is not attempting EQc3.2) before occupancy to help remove any lingering VOCs from the construction process. This can be as simple as putting industrial sized fans in the window and pumping in fresh air overnight or running the HVAC exhaust on high for a few days. (See EQc3.2: Construction Indoor Air Quality Plan—Before Occupancy if the team wants to do a full flush-out for an additional LEED point.)