If you are installing sensors and controls, they should be configured per specifications. Surprisingly, these are occasionally miscalibrated or even reversed, causing discomfort to occupants, cost to the owner, and system malfunction.
If you are installing a BMS, configure and program it to specifications. If there was any change in system specifications, make sure it is accounted for in the BMS programming.
All the design work is implemented during construction. Have the project architect ensure that the glazing is per your specifications and that the façade system incorporates a continuous air barrier.
It is usually a good idea to do a “mini air flush” (if your project is not attempting EQc3.2) before occupancy to help remove any lingering VOCs from the construction process. This can be as simple as putting industrial sized fans in the window and pumping in fresh air overnight or running the HVAC exhaust on high for a few days. (See EQc3.2: Construction Indoor Air Quality Plan—Before Occupancy if the team wants to do a full flush-out for an additional LEED point.)
Schedule the installation of absorptive composite materials so that they are protected from construction air contaminants. This is required if projects are attempting EQc3.1: Construction Indoor Air Quality Plan—During Construction, but is a good practice in any case. For example, storing or installing composite
Post signs at the construction site that reminds subcontractors to follow LEED requirements for using urea-formaldehyde-free composite materials and laminating adhesives. (Link to Signage UF)