ad-100000495

change "This credit focuses only on sidewalks, patios, and driveways, but the strategies included..." to "This credit focuses on new and existing sidewalks, patios, and driveways within 50 feet of the home, but the strategies included..."

ad-100000494

"Acceptable strategies include the following:i. White concreteii. Gray concreteiii. Open pavers (counting only the vegetation, not the pavers); andiv. Any material with a solar reflectance index (SRI) of at least 29."change to:"Acceptable strategies include the following:i. White concreteii. Open pavers (counting only the vegetation, not the pavers); andiii. Any material with a solar reflectance index (SRI) of at least 29."

ad-100000493

change "No additional points are available for exemplary performance." to "A project that earns SS 2.5 can earn 1 point, to be counted under Innovation & Design Process Credit 3, for fulfilling SS 2.2 parts b, c, and d. See the Exemplary Performance section under WE 2.3 for additional credit for projects that demonstrate exemplary outdoor water savings."

ad-100000238

In the second bulleted item, replace the text "MR Credit 2: Sustainable Purchasing - Durable Goods" with "MR Credit 2.1: Sustainable Purchasing - Electric-Powered Equipment" and, below as a new bulleted item, "MR Credit 2.2: Sustainable Purchasing - Furniture"

ad-100000237

In the first bulleted item, replace the text "MR Credit 2: Sustainable Purchasing - Durable Goods" with "MR Credit 2.1: Sustainable Purchasing - Electric-Powered Equipment" and, below as a new bulleted item, "MR Credit 2.2: Sustainable Purchasing - Furniture"

ad-100000236

In the fifth row, replace the text "MR Credit 2 Sustainable Purchasing - Durable Goods" with "MR Credit 2.1 Sustainable Purchasing - Electric-Powered Equipment" and, below as a new row, "MR Credit 2.2 Sustainable Purchasing - Furniture"

ad-100000023

In the third line of the first paragraph, insert a "be" between the words "should" and "treated" so the text becomes "...on-site wastewater should be treated..."

ad-100000007

Following this section, create a new section with the header "Design orConstruction Phase Submittal" and insert the table as indicated in the supplemental documentation.

ad-100000006

Remove the text of the second paragraph and replace with "Projectteams are subject to Rating System addenda requirements based onregistration date. It is strongly recommended that project teams adhere to the Reference Guide and Reference Guide addenda based onregistration date. Rating System and Reference Guide addenda can befound on the USGBC\'s LEED Addenda website, www.usgbc.org/addenda. "