100001926

Table 1. Manufactures' documentation for compliant products
In the column labeled "What Has to be Reported" change the row for "Manufacturer's inventory to, "All ingredients at or above 0.1%; Report hazards associated with LT-1, LT-P1 (GS List Translator) or Benchmark 1 (full GreenScreen) scores"

In the column labeled "Based on What Framework" change the row for "Manufacturer's Inventory" to "GreenScreen (GS) v1.2 or higher (either GS List Translator or full GreenScreen)"

100001923

Change the first sub-bullet under GreenScreen version 1.2 benchmark to read "All ingredients screened using GreenScreen List Translator and no ingredients with Benchmark 1 hazards, 100% value (by cost)"
Change the second sub-bullet under GreenScreen version 1.2 benchmark to read "All ingredients fully assessed by full GreenScreen method and no ingredients with Benchmark 1 hazards, 150% value (by cost)"

100001981

Step-By-Step Guidance
Step 1. Select System
Remove the last sentence in the last bullet. The sentence to delete reads "Each unit must be able to control the demand pump that provides hot water when needed."
Step 2. Design System
Remove the following bullets under 'Demand circulation loop design':
Bullet two, which starts with "Confirm that the actual installed..."
Bullet four, which starts with "Provide controls (e.g. switches, motion sensors)..."

100001906

Minimum Program Requirements
Under "Additional Guidance, Site," edit the two sub-bullets and and bullet below to the following:
"o If another building or structure within the LEED project boundary is ineligible for LEED certification, it may be either included or not included in the certification of the LEED project.
o If another building within the LEED project boundary is eligible for LEED certification, it may be either included or not included in the certification as outlined in USGBC’s campus guidance.

100001979

Replace:
An Excel version of the WaterSense Water Budget Tool can be found under the Resources tab for this credit, at usgbc.org/credits.
Project teams outside the U.S. must complete the tool using IP rather than SI units. Use the conversion calculator found under the Resources tab.

With:
Projects outside the U.S: use the non-U.S. water budget calculator, which can be found on usgbc.org. Projects must provide rainfall and evapotranspiration data for their location. This calculator uses SI units.

100002307 Process for attempting credit substitutions in BD+C, ID+C v4.1 beta guides

Update the first three steps of process for attempting credit substitution to read as follows:

Process for attempting credit substitutions:

1. In LEED Online, within each credit in your v4 project, you will see a gray arrow icon on the right side of each attempted credit on the credits tab.
2. Click this icon for each credit you would like to substitute.
3. You will see a popup box that reads: “I am pursuing a LEED v4.1 credit substitution on this credit." Click “Confirm” for each credit you plan to attempt.