ad-100001009
In alphabetical order, add the term "An appurtenance is any built-in, nonstructural portion of a roof system, such as skylights, ventilators, mechanical equipment, partitions, and solar energy panels."
In alphabetical order, add the term "An appurtenance is any built-in, nonstructural portion of a roof system, such as skylights, ventilators, mechanical equipment, partitions, and solar energy panels."
In alphabetical order, add the term, "Roof area is the area of the uppermost surface of the building which covers enclosed Gross Floor Area, as measured when projected onto a flat, horizontal surface (i.e. as seen in Roof Plan view). \'Roofs\', or portions of roofs, covering unenclosed areas (e.g. roofs over porches and open covered parking structures) are not included in the areas used to evaluate compliance with Path 5, though they may be applicable to Path 4."
*Update to addenda issue ID# 100000296, originally posted 12/2/2009* Following this section, create a new section with the header "Design or Construction Phase Submittal" and insert the three tables below.
In the fourth row of the table, change "lists of ingredients with GreenScreen benchmarks" to "lists of ingredients with GreenScreen Benchmark or LT scores"
In the last sentence of the third paragraph, replace "also" with "not" so that the sentence reads: "Projects in the U.S. may not use this alternative compliance path."
Delete Figure 2. Example master plan project
Revise the sentence that begins with "Use the following steps..." and step 5, and also add a paragraph to the end of this section:
Use the following steps to determine the percentile of rainfall events:
5. The USGBC calculator determines the various percentile rainfall amounts. If using another spreadsheet software, apply a percentile function (or similar) to obtain results.
Revise step 5 and add a paragraph to the end of this section:
5. The USGBC calculator determines the various percentile rainfall amounts. If using another spreadsheet software, apply a percentile function (or similar) to obtain results.
Detailed explanation regarding calculation of the percentile event using daily rainfall records can be found in EPA 841-B-09-001, December 2009, www.epa.gov/owow/nps/lid/section438.
Add "soil qualities" to the cell about plans, details, or cross sections:
"Plans, details, or cross sections depicting site conditions and GI or LID strategies, highlighting topography, soil qualities, direction of water flow, and area of site that each facility addresses"
Replace the definition of "native vegetation" with the following:
"a species that originates in, and is characteristic of, a particular region and ecosystem without direct or indirect human actions. Native species have evolved together with other species within the geography, hydrology, and climate of that region."