ad-100000632

"Visually verify that all design calculations are completed." change to "Collect the Manual J & D calculations and verify that they were fully and properly completed, per LEED for Homes Verification and Submittal Guidelines."

ad-100000644

[Add new paragraph before the last paragraph that starts "If the project includes a garage...]"There cannot be a door from an air handling unit closet that opens into the garage. The access door to an air handling unit must open into the living space, or the exterior of the building."

ad-100000641

a) In conditioned spaces above the garage: i) Seal all penetrations; ii) Seal all connecting floor and ceiling joist bays; and iii) Paint walls and ceilings (carbon monoxide can penetrate unfinished drywall through diffusion). Change toa) In conditioned spaces above the garage:i) Seal all penetrations;ii) Seal all connecting floor and ceiling joist bays.

ad-100000639

"If tests for radon are positive, install an active radon mitigation system... below the house." change to "If tests for radon are positive, install an active radon mitigation system... below the house. After the mitigation system is installed, re-test for radon to ensure that the system is functioning properly to remove radon."