ad-100000297

Replace the fourth paragraph with the following text:If a project is designed and constructed to be partially occupied by theowner or developer, then the owner or developer has direct influenceover that portion of the interior build-out work. For these projects,LEED for New Construction may be more appropriate. Please see theRating System Selection Policy, located in the LEED resources sectionof www.usgbc.org, for more information about choosing a ratingsystem.

ad-100000368

In first line, remove the following text:This project needs to purchase Green-e-certified green power orRECs equal to 106,271 kWh/yr."Replace with "This project needs to purchase Green-e-certifiedgreen power or RECs equal to 106,271 kWh over a period of 2years.

ad-100000366

In the first paragraph, replace "International PerformanceMeasurement and Verification Protocol, Volume III, EVO30000.1-2006, Concepts and Options for Determining EnergySavings in New Construction, effective January, 2006" with"International Performance Measurement & Verification Protocol(IPMVP) Volume III: Concepts and Options for Determining EnergySavings in New Construction, April, 2003"

ad-100000365

Replace the text with "If there are multiple pieces of base building HVAC&R equipment, use a weighted average of all equipment, based on Gross ARI rated cooling capacity:"

ad-100000364

Beginning in the second line of the paragraph beginning with "Refrigerant leakage rate (Lr)...," remove text as indicated in the supplemental document.

ad-100000304

In last line of the third paragraph, replace "without any no barriers" sentence with "with no barriers" so it becomes "...more directions with no barriers (e.g..."