BuildingGreen Bulletin: Efficient HVAC Options — September GreenSpec
by
Easy prerequisite – provide space for recycling
This prerequisite is very easy to meet. You only need to provide one space to store recycling. You are not even required to have a specific square footage, although the LEED Reference Guide does provide recommended square footage based on building size (see table below). To size this space properly, also consider the building’s needs and recommendations from your recycling hauler.
Easy prerequisite – provide space for recycling
This prerequisite is very easy to meet. You only need to provide one space to store recycling. You are not even required to have a specific square footage, although the LEED Reference Guide does provide recommended square footage based on building size (see table below). To size this space properly, also consider the building’s needs and recommendations from your recycling hauler.