In the first line of the paragraph, the ")" after the text "device of" is moved to follow the word "device" so it becomes "(by automatic device) of..."
In the first line of the paragraph, the ")" after the text "device of" is moved to follow the word "device" so it becomes "(by automatic device) of..."
In the third cell of the table\'s title row, replace "Rage" in the column header with "Range" so it becomes "Probable Range of TSS Removal"
Note the following addenda under \'Calculating Materials Costs to Achieve MR Credits\' on page 337:Add the following after "...Furniture and Furnishings as long as this is done consistently across all MR credits.", "Exclude artwork, interior plants, and musical instruments."
In the third row of item "a," replace "classified as G1, G2" with "classified as GH, G1, G2"
Replace the first line of text with "On sites that are not previously developed sites, protect existing slopes over 15% as follows:"
Replace the paragraph with the following:Locate the project within a region served by a metropolitan planning organization (MPO) and within a transportation analysis zone (TAZ) where either a) the current annual home-based vehicle miles traveled (VMT) per capita (if TAZ is 100% residential) or b) the annual non-home-based VMT per employee (if TAZ is 100% non-residential) does not exceed 90% of the average of the equivalent metropolitan region value.
Below Option 3, replace the text with the following:At least 75% of the nonroof site hardscape area uses Option 1-compliant strategies and at least 75% of the roof area of new buildings uses Option 2-compliant strategies.
Remove the last sentence in the paragraph, "Annual energy costs must be estimated using an accepted building energy performance simulation tool."
Below the Washington State Department of Ecology entry, add the following text:Note that only BMPs related to infiltration, reuse, and evapotranspiration are appropriate to meet the credit requirements, though other types of BMPs are also found in the manual, for example: BMP T11.11 Coalescing Plate (CP) Separator Bay, BMP T6.10 Presettling Basin, and BMP T8.10 Sand Filter Vault.
Below the table, replace the first sentence of the first paragraph with the following:"Determine, if applicable, the controller efficiency (CE), the percentage reduction in water use from any weather-based controllers or moisture sensor-based systems, not to exceed 30% for the peak month of July."