ad-100000372
In the second line of the paragraph, replace "kWh per year" with "kWh over a period of 2 years"
In the second line of the paragraph, replace "kWh per year" with "kWh over a period of 2 years"
In the equation, replace the second "X" with "=" so the text becomes "19,000 (sf) X 11.7 (kWh/sf/yr) = 2,223,000 (kWh/yr)
At the end of the first paragraph, insert the following text:Entities that install an FSC-certified product on the projectbuilding/site (typically project contractors or subcontractors, butalso furniture installers and the like), do not require CoCcertification as long as they do not modify the product\'s packagingor form except as is required for installation. Contractors and subcontractorsthat temporarily possess FSC-certified material prior toinstallation should be careful not mix or contaminate the FSCcertifiedmaterial with non-FSC-certified material.
In fifth line of the paragraph, insert spaces between the words of the text so it becomes "...perspective, the elements of responsible FSC-certified forestry include sustainable timber harvesting..."
Insert the term "Extraction, harvest or recovery point" in alphabetical order with the accompanying text "Extraction, harvest or recovery point refers to the location of raw materials prior to manufacturing of the building material or product that is furnished and installed in the project building."
Following the third paragraph and before Table 2, insert the following section text:Recycled MaterialsRecycled materials that satisfy the requirements of MR Credit 4may also contribute to MR Credit 5. The extraction point forrecycled materials is the location of the raw material prior to themanufacturing of the final building product. As such, the point ofextraction could include a recycling facility, scrap yard, depository,stockpile, or any other location where the material was collectedand packaged for market purchase before manufacturing.
Remove the heading "CASE 1. All Projects"
In the "Schools" column of the table, in the 24th row titled "IEQ Credit 8.2," replace "1-3 points" with "1 point"
Following the third paragraph and before Table 2, insert the following section text:Recycled MaterialsRecycled materials that satisfy the requirements of MR Credit 4may also contribute to MR Credit 5. Use the location from whichthe material was collected or deposited as the point of extraction.In most cases this will be a recycling facility or scrap yard.Disregard the original source of the material. Use the location ofthe new product manufacturer as the point of manufacture. In somecases the recycling facility may also be the manufacturer.
Replace the second sentence with the following:Building height is measured to eaves or the top of the roof for a flat-roof structure, and street width is measured fa