ad-100000820

In both Option 1 and Option 2, in the last line of the first sentence, replace the text after "certifying bodies" with the following: that have either been accredited by an IAF accreditation body to, or could demonstrate compliance to, ISO 17021 or ISO/IEC Guide 65, and, when subsequently available, ISO/IEC 17065.

ad-100000819

In the last line of the paragraph, replace the text after "certifying bodies" with the following: that have either been accredited by an IAF accreditation body to, or could demonstrate compliance to, ISO 17021 or ISO/IEC Guide 65, and, when subsequently available, ISO/IEC 17065.

ad-100000818

Replace the first sentence with the following:Establish covenants, conditions, and restrictions (CC&R) or other forms of deed restrictions which state that the growing of produce is not prohibited in project areas, including greenhouses, any portion of residential front, rear, or side yards; or balconies, patios, or rooftops.

ad-100000823

In the paragraph, replace the last sentence with "Combinations of SRI-compliant and vegetated roofs can be used provided they satisfy the equation in Option 3."

ad-100000821

Replace the paragraph (continues onto next page) with the following:Select BMPs from the Washington State Department of Ecology\'s Stormwater management Manual for Western Washington, Volume V, Runoff Treatment (2005 edition), or locally approved equivalent, whichever is more stringent. If the BMPs are comparable in stringency, choose BMPs that are most appropriate to the project site and region. BMPs must also comply with all federal, state, and local regulations.