ad-100000212
In the seventh row of the table in the "Flow Fixture" column, replace "Low-flow shower" with "WaterSense shower"
In the seventh row of the table in the "Flow Fixture" column, replace "Low-flow shower" with "WaterSense shower"
In the beginning of the first line of the first paragraph, insert the text "With the exception of prerinse spray valves"
In the fifth row of the table in the "Flow rate" column, replace "1.8 gpm" with ""? 2.2 gpm"
Insert the term "Tenant space" in alphabetical order with the accompanying text "Tenant space is the area within the LEED project boundary. For more information on what can and must be in the LEED project boundary see the Minimum Program Requirements (MPRs) and LEED 2009 MPR Supplemental Guidance. Note: tenant space is the same as project space."
Insert the term "Tenant space" in alphabetical order with the accompanying text "Tenant space is the area within the LEED project boundary. For more information on what can and must be in the LEED project boundary see the Minimum Program Requirements (MPRs) and LEED 2009 MPR Supplemental Guidance. Note: tenant space is the same as project space."
Insert the term "Tenant space" in alphabetical order with the accompanying text "Tenant space is the area within the LEED project boundary. For more information on what can and must be in the LEED project boundary see the Minimum Program Requirements (MPRs) and LEED 2009 MPR Supplemental Guidance. Note: tenant space is the same as project space."
In the first line of the second bulleted item, insert "or 5.6" after "5.5" so the text becomes "...(Sections 5.5 or 5.6, 6.5, 7.5 and 9.5)..."
Insert the term "Tenant space" in alphabetical order with the accompanying text "Tenant space is the area within the LEED project boundary. For more information on what can and must be in the LEED project boundary see the Minimum Program Requirements (MPRs) and LEED 2009 MPR Supplemental Guidance. Note: tenant space is the same as project space."
Insert the term "Tenant space" in alphabetical order with the accompanying text "Tenant space is the area within the LEED project boundary. For more information on what can and must be in the LEED project boundary see the Minimum Program Requirements (MPRs) and LEED 2009 MPR Supplemental Guidance. Note: tenant space is the same as project space."
Below the bulleted items, remove the following text:Develop and implement a measurement and verification (M&V) plan thatincorporates the monitoring information from the above end uses and isconsistent with Option B, C or D of the 2001 International PerformanceMeasurement & Verification Protocol (IPMVP) Volume I: Concepts andOptions for Determining Energy and Water Savings.Provide a process for corrective action if the results of the M&V planindicate that energy savings are not being achieved.