Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Tenant services and submetering

CS-v4 WEc4:Water metering
posted by  Clara Sosa D´Este  on 

Hi everyone, we are working on a shopping mall and we wanted to know, in the case that a tenant of the project is going to build bathrooms and kitchens for their particular business, if we have to

0

Tenant contracts their own electrical power

CS-v4 EAp3:Building-level energy metering
posted by  Clara Sosa D´Este  on 

Hi everyone, we wanted to know if, in the case a tenant contracts their own electrical power for their space, if we have to meter that line as well or if we have to meter only the base building pow

1
Mon Dec 27, 2021, 6:19 pm

What is the difference between V01 form of V4 version and V4.1 version

Data-Centers-NC-v4 MRp1:Storage and collection of recyclables
posted by  David LEBRET  on 

Hi, I'd like to know the difference between V01 form to be completed of version V4 and V4.1.

Thanks

1
Thu Jan 20, 2022, 4:16 am

Documenting local equivelant

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Omar Elrawy  on 

We have a project in Vietnam in which the local standard (5.5 lps/person) is more stringent than ASHRAE 62.1.

Q1: Does a more stringent standard means higher fresh air requirements?

5
Associate, Sustainability
Thornton Tomasetti
LEEDuser Basic Member
12 thumbs up
Thu Dec 16, 2021, 8:46 pm
6
Senior Energy Wizard
TLC Engineering Solutions
LEEDuser Premium Member
44 thumbs up
Thu Dec 16, 2021, 5:04 pm

This Month's Call

Sustainable MEP Leaders
posted by  Jennifer Zakrzewski  on 

Hello everyone,

Here's a reminder that our call for this month will be taking place next Tuesday, November 12th at 2:00pm EST.

Please feel free to join us!

62
National Director of Engineering
LEO A DALY Company
LEEDuser Basic Member
0 thumbs up
Thu Dec 16, 2021, 4:51 pm

ENERGY MODEL FOR OFFICE IN BASEMENT

CI-v4 EAp2:Minimum energy performance
posted by  S S  on 

Hello to All,

Greetings!

I am doing the energy model for Office Building which has located in Basement. In our software, U value only can be given as input.

3
Default Avatar
LEEDuser Basic Member
0 thumbs up
Wed Dec 15, 2021, 7:07 pm

Where and how install the meters in a in a new multi-use construction?

NC-v4 EAp3:Building-level energy metering
posted by  Sara BENLOUBA  on 

Dear all,

We have a tower with multi-storey building, made up of 3 components: Offices, hotel and residential. We follow as a reference the " BD+C NC "

1
Thu Dec 16, 2021, 2:17 pm

Shower Facilities - 200 yard requirement

NC-v4.1 LTc6:Bicycle Facilities
posted by  Theresa Lehman  on 

In LEED v4, the 200 yard requirement was removed for shower facilities.

1
Wed Dec 15, 2021, 3:19 pm

Tomorrow's SAL call

Sustainable Advising Leaders
posted by  Nicole DeNamur  on 

Hello SAL Members - after last month's call, and invitation to do some thinking around the direction of the group, a few of us connected and brainstormed questions that might help guide a

12
Tue Dec 14, 2021, 8:44 pm