Partially Irrigated Site
NC-2009 WEc1:Water Efficient Landscapingposted by William Weaver on
This question is somewhat related to Leah's question dated 1.23.2012, but a different circumstance.
Combined approach to WEc2
NC-2009 WEc2:Innovative Wastewater Technologiesposted by Michael Wironen on
We have a project where, through efficient fixtures, we will reduce wastewater (WCs, lavatories, and showers) conveyance by approximately 45%.
Custom wood base - offsite millwork finishes included?
CI-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Vince Briones on
Hi all, Just seeking confirmation as a situation pertaining to hardwood floor base.
New to AGMBC
posted by Henrique Mendes on
Hi there. We have a client that has 6 projects of buildings to be constructed at different location. But all this 6 projects are the same.
PV System as part of a Master Site
CS-2009 EAc2:On-site Renewable Energyposted by Ben Tucker on
Does anyone have any experience submitting for EAc2 as part of a Master Site? Our project is a campus project that will contain three buildings.
Gross Square Footage and Building Footprint.
NC-2009 PIf2:Project Summary Detailsposted by Lynne Martin on
Our project is a one story learning/conference center. In this case is the gross square footage the same as the building footprint?
Testing Exhaust Fans
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by cathy keagle on
Does anyone have advice for a building where we are unable to find the drawings which specify the Design CFM for some of the exhaust fans?
Residential project
posted by Emmanuel Pauwels on
We will start a residential project (more then 4 stories) The client is a developer who will sell and rent out the appartments.
Baseline for hospitals
NC-2009 EAp2:Minimum Energy Performanceposted by Lise Dannesboe on
Hej! As there is a baseline for data centers (tool developed in excel), is there also a similar document or any guideline for hospitals?
Data Centers baseline
NC-2009 EAp2:Minimum Energy Performanceposted by Gustav Alfaro on
Hi to all: We are modeling a data center under LEED v2009, but we need to show savings in the process loads (servers, UPS and transformers) since the achieved savings in HVAC and lighting systems