Log in
Forum
Topic

When is the lighting zone classification determined?

NC-2009 SSc8: Light Pollution Reduction
posted by Mark Meaders on Jul 25, 2011, 3:39 pm

We have a govt. project that is building on a greenbuild site. The pre-development condition of the site is an LZ1. However, after the project is developed, there will be over 1m sq. feet of...

Tenant Layout

CS-2009 IEQp1: Minimum indoor air quality performance
posted by Dan Forino on Jul 25, 2011, 9:51 am

For our LEED CSv2.0 project, we have been asked to provide a proposed tenant layout for approximately 6 office spaces. There are (2) office spaces and (1) corridor space for each of (3) Roof Top...

Last reply: Dan Forino, Jul 25, 2011, 1:24 pm

lighting pollution simulation software

NC-2009 SSc8: Light Pollution Reduction
posted by qi zhang on Jul 25, 2011, 1:27 am

I plan to get the this credit through simulation.
I heard that DIALUX seems can get it, but I am not so sure.
Please help me and tell me if I plan to get this credit though simuation...

LEED for Schools Case 1 OR Case 2

Schools-2009 IEQc6.1: Controllability of systems - lighting
posted by Dana Murdoch on Jul 16, 2011, 8:19 pm

Can anyone comment on the Case 1 OR Case 2 for LEED for Schools? The letter template make allows you to use EITHER path, not BOTH as is implied in the text above in the LEED User interpretation....

Last reply: Kate Randolph, Jul 24, 2011, 1:54 am

EQc6.1 Documentation

Schools-2009 IEQc6.1: Controllability of systems - lighting
posted by Dana Murdoch on Jul 16, 2011, 8:44 pm

Does LEED have a form for inputing rooms/controllability in Version 3 like they did for Version 2.2?? Or do we just make up our own format?

Last reply: Kate Randolph, Jul 24, 2011, 1:49 am

Percentage of finished floor complying for the credit

Schools-2009 IEQc4.3: Low-Emitting Materials—Flooring Systems
posted by Dario Ibarguengoitia on Jul 7, 2011, 2:27 pm

MY QUESTION IS.. WHAT IF I JUST HAVE 25 % OF THE FINISHED FLOOR AREA USING LOW EMITTING OR CERTIFIED PRODUCTS, AM I STILL EARNING THE CREDIT?
IM AM NOT CLEAR ABOUT THE PERCENTAGE OF THE...

Last reply: Kate Randolph, Jul 24, 2011, 12:40 am

what happens when verification turns up changes?

NC-2009 EAp1: Fundamental Commissioning of Building Energy Systems
posted by Tristan Roberts on Jul 20, 2011, 2:33 pm

It's a requirement for EAp1 that the...

Last reply: Susann Geithner, Jul 22, 2011, 5:53 pm

Building Over Hang

CI-2009 EAp2: Minimum Energy Performance
posted by Simon Sue on Jul 13, 2011, 9:20 pm

We working on a commercial bank and calculating the installed...

Last reply: Susann Geithner, Jul 22, 2011, 5:00 pm

SIMULATION METHOD

CS-2009 EAp2: Minimum Energy Performance
posted by RICARDO GUEMEZ DIAZ on Jul 22, 2011, 2:22 pm

HI, IM RICARDO GUEMEZ FROM MEXICO CITY, I AM IN THE PROCESS OF SIMULATING A WAREHOUSE FOR TENANT LEASING, THE OWNER IN ALL PROJECTS ONLY INCLUDE NATUARAL VENTILATION WITH IEQ-01 COMPLIANCE....

Last reply: Susann Geithner, Jul 22, 2011, 4:43 pm

Permeable or Mulched Paths in Calculations

NC-2009 WEc1: Water Efficient Landscaping
posted by Terry Gorski on Jun 30, 2011, 3:36 pm

How would permeable or mulched paths be shown in the LEED Online form calculations? Would they still be considered landscaping, and not irrigated, and left in the calculations? If some of the...

Last reply: Susann Geithner, Jul 22, 2011, 3:51 pm