Mark LEED v4 credit as ready

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Charalampos Giannikopoulos  on 

Does anyone know how a credit/prerequisite can be marked as "ready" in the new LEED Online (v4)?

2
Thu Sep 4, 2014, 1:05 pm

What does "can include" mean?

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Aron Weis  on 

If there is a non-LEED-certifiable building within the LEED project boundary, the project team can include the non-certifying building within the project boundary in ALL relevant submittals that ar

8
Thu Sep 4, 2014, 4:16 am

Appendix 4 - Case A

CS-2009 WEp1:Water Use Reduction
posted by  Sy Shumaker  on 

We have a CS project with no signed tenants yet. The owner is providing central restrooms and showers for all of tenants in the base CS project.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Sep 3, 2014, 7:39 pm

Glazing location for visual access

NC-2009 IEQc8.2:Daylight and Views—Views
posted by  SSN Energy Model  on 

One of our project (office building), sill height of the glazing is 6.5 feet from finished floor level & glazing height is 3.3 feet. All the regularly occupied spaces are having glazings at th

5
Wed Sep 3, 2014, 6:42 pm

LEED Project Boundary

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Rezkar Abdulmajeed  on 

Can someone help me with this please?. I am working now in a health care LEED Project. The LEED Boundary was set already when we submitted the MPR.

2
Default Avatar
Shanghai Pacific Energy Center
LEEDuser Basic Member
12 thumbs up
Wed Sep 3, 2014, 5:34 pm

MRc4 - Recycle Content of Reinforcement Steel

NC-2009 MRc4:Recycled Content
posted by  Keerthi Ratnayake  on 

How can we use the reinforcement steel towards this credit? Generally, suppliers do not have any information. Can we count 50% straightaway? Thanks

2
Default Avatar
LEEDuser Expert
472 thumbs up
Wed Sep 3, 2014, 2:15 pm

Stormwater rate and quantity calculation for case 1

NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  sona prajapati  on 

Dear all, We have found a sample calculation to determine storm water rate and quantity for 1 yr-24 hr design storm and 2 yr-24 hr design storm from www.illinoisfloods.org/.../4D_Stormwater%20Volum

2
Regional Stormwater Leader
Arcadis North America
LEEDuser Expert
144 thumbs up
Wed Sep 3, 2014, 5:11 am

90% of average annual runoff

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Jamison Hill  on 

Is that the pre-development runoff rate or post-development runoff rate?

8
Regional Stormwater Leader
Arcadis North America
LEEDuser Expert
144 thumbs up
Tue Sep 2, 2014, 3:09 pm

LEED NC 2009 for factory buildings

NC-2009 EAp2:Minimum Energy Performance
posted by  Rathnashree Bharadwaj  on 

The project is a manufacturing facility with ancillary buildings such as admin, health centre, canteen, utility and security blocks. The buildings are not physically connected to each other.

5
Tue Sep 2, 2014, 2:25 pm
3
Sun Aug 31, 2014, 6:05 pm