Forum quick links
Wind renewable energy- Green Powert
NC-2009 EAc6:Green powerposted by Ramesh Narayanan on
One of our client has already own the wind turbine for 100% of the buildings electricity. They want to show that wind turbine power to meet the LEED requirement.
Modeling Heat Reclaim in EAp2 v2009
NC-2009 EAp2:Minimum Energy Performanceposted by Mario S. on
Hello, We are working on a project that uses heat reclaim as a source of energy for service hot water.
Landscaped area included or only irrigated landscape areas?
NC-2009 WEc1:Water Efficient Landscapingposted by Kevin Gilleran on
Are all landscaped areas within the LEED project boundary included in the calculations for this credit or just irrigated landscaped areas?
WaterSense Labeled Products
NC-v4 WEp2:Indoor water use reductionposted by Mark Zoeteman on
Reference Guide indicates WaterSense label requirements are mandatory in U.S.
Natural ventilation
NC-2009 IEQp1:Minimum IAQ Performanceposted by Gaston Michaud on
We are working on a residential core and shell project, and we are having some issues with the compliance of ASHRAE 62-1 ventilation requirements. Basically, the building has apartments on each lon
LEED Design Review and Final Certification Proceedures
posted by Susannah Goddard on
We are currently working our way through our Design Stage Review comments from USGBC.
LEED final review...past due?
posted by John Stouffer on
Is LEED final review typically late? The anticipated date of return was 10 days ago. We're getting a little nervous. We did have a clarification, but that was returned in a timely manner.
agricultural site, previously graded?
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Mónika Egyed on
Hi, the project of ours has a site with current agricultural use, there is only 1-2% of the site with native vegetation. In this case, can we use Option 2 - previously developed or graded?
Lessons learned
posted by Mara Baum on
I'm seeding this conversation with a few things that Kim and I have come up in our conversations so far: - Are you connecting to another building on an existing campus?
Speciality
EBOM-v4 INc2:LEED Accredited Professionalposted by Ralf Lehmann on
Is a LEED AP BD+C also eligible for earning the credit under EBOM?