Very disappointing
posted by Renee Azerbegi on
This extension is most unfortunate as it makes LEED out of sync with ASHRAE’s energy targets for NZE per the ASHRAE 2020 Vision.
LEED GAs and APs exams
posted by KONSTANTINOS VAVALETSKOS on
USGBC has announced that LEED 2009 project registration is extended to October 2016. Does anyone knows if the same applies for the LEED GAs and APs exams?
Explain the reasons for the change
posted by Marcus Sheffer on
I would suggest that USGBC provide a more in depth explanation for the delay.
Green e equivalence
EBOM-2009 EAc4:On-Site and Off-Site Renewable Energyposted by David ESPAGNET on
Hello. In the "credit language" above is precised : " Projects in Europe may use the following approved standards in place of Green-e Energy: - EKOenergy - Guarantees of Origin (GOs) with additiona
90.1-2007 Addendum dn
NC-2009 EAp2:Minimum Energy Performanceposted by Sarah Gudeman on
Does anyone have experience modeling this for LEED EAp2/c1?
LEED v4 Extension
posted by Jerry Yudelson on
USGBC raised the bar, but then lowered it again?
EBOM v4 prereqs a barrier?
posted by Nadav Malin on
Gary--I'm interested in your experience with the College that couldn't do EBOM v4 because of the prereqs. Can you say which prereqs were the challenge?
Fresh Air Intake
NC-2009 IEQp1:Minimum IAQ Performanceposted by Hellen Hee on
I've a question on the Fresh Air calculation, with the following scenario...
Comms/ data room cooling - Process Energy for LEED
NC-2009 EAc1:Optimize Energy Performanceposted by Victoria Watson on
Hi all, I am working on a project where the CRAC unit manufacturers have said they don't need to comply with the efficiency requirements of ASHRAE 90.1 for a data room and comms rooms air conditio