Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Can Janitor closet be tied to restroom exhaust

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Leticia SooHoo  on 

Hello, we are working on a commercial office building project. We are intending to meet the requirements of IEQc5 by providing exhaust to the janitor closets.

2
Director - Green Building Advisory
Colliers International Ltd.
LEEDuser Basic Member
201 thumbs up
Fri Dec 5, 2014, 12:22 am

ANSI/BIFMA Testing Date vs Manufacture Date

CI-2009 IEQc4.5:Low-Emitting Materials—Systems Furniture and Seating
posted by  Nicole Schuster  on 

This credit requires that the manufacturing period must be within the certification period.

2
Default Avatar
LEED Consultant
The Green Engineer
LEEDuser Basic Member
188 thumbs up
Thu Dec 4, 2014, 9:40 pm

EAp2 Online form - Table EAp2-1. Space Usage Type -

NC-2009 EAp2:Minimum Energy Performance
posted by  Vassil Vassilev  on 

Greetings, There is a clarification question associated with a reviewer's remark. From the modeling software (Trace 700) reports, the spaces are divided to Regularly occupied and Unconditioned (as

5
Thu Dec 4, 2014, 9:20 pm

Providing clarifications to Design Phase Review

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Susannah Goddard  on 

Our project has just received the Design Phase Review feedback from USGBC and we are now in the process of addressing the issues raised with some of the credits.

7
Default Avatar
VP of Innovation
Sustainable Investment Group
LEEDuser Basic Member
110 thumbs up
Thu Dec 4, 2014, 4:05 pm

Retail Loading docks

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Sunayana Jain  on 

According to LEED for Retail, "employ permanent entryways systems for all entrances including back-of-house areas such as loading docks or service areas." In my case loading docks will only used f

5
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Thu Dec 4, 2014, 5:10 am

Supplemental Table 1.4 - reviewers comment

NC-2009 EAp2:Minimum Energy Performance
posted by  Vassil Vassilev  on 

Greetings, I've received a comment from a reviewer, that insufficient info regarding VAV reheat terminal units are provided in this table.

3
Wed Dec 3, 2014, 7:17 pm

Views from a single occupancy dorm/bed room

NC-2009 IEQc8.2:Daylight and Views—Views
posted by  Nelina Loiselle  on 

Hello, I am working on a dorm project that has some single occupancy bed rooms with access to views.

4
Wed Dec 3, 2014, 1:23 pm

Handicap Access

EBOM-2009 IEQc3.5:Green Cleaning—Indoor Chemical and Pollutant Source Control
posted by  Mary Grace Wong  on 

Our building has a separate main entrance and handicap access (which includes an elevator to travel between street level and lobby vertically).

2
Tue Dec 2, 2014, 9:02 pm

Column Veneer preserved but covered

NC-2009 MRc2:Construction Waste Management
posted by  Madhura Dhayagude  on 

We are working on a project where the client wants to preserve the existing column veneer, however they want to cover the whole column with a new finish.

3
Tue Dec 2, 2014, 7:46 pm

Option 2 Simulation

NC-v4 EQc7:Daylight
posted by  Charalampos Giannikopoulos  on 

For Option 2 (Simulation) is it accepted to run the simulation for 9.00 and 15.00 on September 21 only, or should it be repeated for March 21st and get the average of both?

2
Tue Dec 2, 2014, 6:58 pm