Forum quick links
Glazing (windows) area - VOC
NC-v4 EQc2:Low emitting materialsposted by Caroline PIN on
Dear all, Does we need to integrate glazing area in Option 2 : Budget calculation method ? Thank you for your help
System 8 Fan Power Allowance
NC-2009 EAp2:Minimum Energy Performanceposted by Omar Elrawy on
Dear All, I have a system 8 (VAV with PFP boxes) baseline and I had a reviewer's comment stating that: "The interior fan demand reported in Table EAp2-4 for the Baseline case exceeds th
Certification RQs for Incomplete Building
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Orçun Özhelvaci on
Our university building undergoes it's construction stage.
LEED EBOM, SS2 & Water Efficiency
EBOM-2009 SSc2:Building Exterior and Hardscape Management Planposted by AtSite Inc on
How many sq. ft. of landscape is needed to qualify for landscape credits?
Lighting control in office space
NC-v4 EQc6:Interior lightingposted by Jeroen Sap on
I am working on an office building that has overhead lighting that is controlled based on occupancy sensors. The fixtures are grouped per 3,6 meters and there is no manual override.
Evaporative Chiller in EAp2?
NC-2009 EAp2:Minimum Energy Performanceposted by Yastimy Jupson on
Hello everyone, i'm now joining a LEED project and the owner wants to use 50RT evaporative chiller in their building, but in ASHRAE standard 90.1, i cannot find the mandatory part for evaporative c
Air Quality Testing after completion
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Mike Stopka on
Hello I have a project that is very close to LEED Gold. I am trying to lock down one more point. The project is in the final phase of the construction submission for LEED.
Where do I enter residential units in form?
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Maria Porter on
My project is a nursing home with some workstations for staff. In the form (v 4.0) on LEED Online there is nowhere to fill out what lighting controls the residents have.
Exemption for Labs
CI-2009 EAc1.1:Optimize Energy Performance—Lighting Powerposted by Amit Ahiel on
Let me preface my question with some context. I have a client (world famous for their electronic gadgets) who is building a lab for research and development of new gadgets and components.
Link to the v4 Water Calculator
NC-v4 WEp2:Indoor water use reductionposted by Dylan Connelly on
http://www.usgbc.org/resources/indoor-water-use-calculator