Forum quick links
Renewable Energy Contract question...
NC-2009 EAc6:Green powerposted by Rick Alfandre on
Our client is trying to sign a 2 year contract for renewable energy, and the company he is engaged with only offers 1 year.
Residential building above
Retail-CI-v4 EQp2:Environmental Tobacco Smoke Controlposted by Francisco Sanchez Arroyo on
I am thinking of upgrading a v2009 project to V4 but I am concerned if I will meet the requirements of this prerrequisite.
Please Consider Universal Accessibility
Pilot-Credits EQpc78:Design for active occupantsposted by Jonathan Ramsey on
Requirement 5 states "Locate a main staircase to be visible before an occupant visually encounters any motorized vertical circulation (elevator/escalator).
Can Ice rink and Ski centre be excluded
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Leanne Niu on
Recently, i am working for a complex commercial project including a ice rink and a ski centre. These two spaces are acturally very special, whether we can exclude them when we consider thermal comf
Non-smoking campus - are exterior signs required?
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Renee Shirey on
My project is on a college campus that is non-smoking on the entire campus, there are no areas with permitted smoking. The streets themselves are university property, not public streets.
Sensor based lavatory faucet compliance
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Faisal on
Hi, How should be the compliance (of 0.25gpc) for sensor based lavatory faucet be checked if the manufacturer mentions only “ adjustable from 1 - 20 minutes “ , the model in question is EAF-200-P-
PFP fan allowance in Table 1.4
NC-2009 EAp2:Minimum Energy Performanceposted by Omar Elrawy on
I have a VAV with PFP system for basecase, and I need to know how to count for the zone fan power in table 1.4, knowing that I did enter each AHU's fan power from the Energy model to table 1.4, the
Can FEV/LEV Spaces In Existing Parking Areas Count?
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Tim Gaidis on
Hi all - I'm working on a v3 NC major renovation project.
Who can be CxA?
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Allan Vásquez on
How do I know which projects are a similar managerial and technical complexity than the one I am working on?
What if other element meets the intend of the credit ?
Pilot-Credits EQpc78:Design for active occupantsposted by George Sebastian Naghiu on
What if we have an element that meets the intend of the credit but is not included in the list of 11 features from which to choose?