Process load significantly lower than 25%
NC-2009 EAp2:Minimum Energy Performanceposted by Panupant Phapant on
The overall process load of our project turns out to be in the vicinity of 15% only. We are aware that 15% is absurdly low and unusual for plants.
Minimum Ventialtion Rates: Locker Rooms
NC-2009 IEQp1:Minimum IAQ Performanceposted by Lawrence Lile on
I am working on a project which has an employee locker room, where truck drivers will come to change or shower after their shifts once a day.
Mandatory provision 5.4 for existing building
NC-2009 EAp2:Minimum Energy Performanceposted by Charalampos Giannikopoulos on
For an existing building under major renovation would the mandatory provision 5.4.3.4 for vestibules be still applicable even if the project scope does not include any additions or plan modificatio
LEED 2009 CI Preliminary Combined Review
CI-2009 IEQp1:Minimum IAQ Performanceposted by Aparna Maladkar on
Hello, I am new to LEED and need some assistance before issuing for preliminary combined review. I have completed all the required project and pre-requisites forms.
signed lease agreement question
CS-2009 EAp2:Minimum Energy Performanceposted by emily reese moody on
Hello, Can you please confirm if the signed lease agreement page needs to include the tenant signature?
VAV Fan control for baseline system 6
NC-2009 EAp2:Minimum Energy Performanceposted by Panupant Phapant on
We have a rough time seeking to reduce supply fan energy during energy simulations.
Submeters to measure AND RECORD energy use
CI-2009 EAc3:Measurement and Verificationposted by Michael Smithing on
In our project the tenant pays a lump sum for thermal energy use, but pays for electricity based on actual consumption. We therefore cannot achieve the 3 points.
MRc2 Form Version 0.2.3.. undervaluing commingled waste?
NC-2009 MRc2:Construction Waste Managementposted by Jake Bebee, LEED AP BD+C, ID+C, WELL AP on
I've been reviewing credits for project teams for a while now and cannot figure this out to save my life. One of my team members has mistakenly entered a bunch (about 88% by tonnage) of commingled
Strip out plan
CI-2009 MRc2:Construction Waste Managementposted by Graham Langton on
We are tendering out project in 2 phases. 1 contractor will be brought on to provide a strip out (typical demolition services of a CI project).