Forum quick links
C&S base building electricity use
CS-2009 EAc6:Green Powerposted by Habitech Distretto Tecnologico Trentino on
Our C&S project includes in the LEED Project Boundary: (1) UNDERGROUND PARKING GARAGE AND EXTERIOR SPACES (BASE BUILDING) (2) commercial spaces (tenant spaces), which correspond to the 100% of
Complex occupancy
NC-2009 PIf3:Occupant and Usage Dataposted by study topenergy on
There is a data center with a complex occupancy (2 shifts). Day shift is 9 hours, 8:30-17:30; night shift is 15 hours, 17:30-8:30. There are 3 persons per shift.
PUBLISHED ACP DOCUMENTATION GUIDANCE FOR PROJECTS OUTSIDE THE US
posted by jorge calderon on
I opened the link at the top of this page, http://bit.ly/tTjUr5. It indicates that is a draft, dated 2011. Is now a published or new document like this?
Parking spaces
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Roberto Meza on
In one of our projects (a bank branch) we have 4 parking spaces out of parking lot, only for employees, these 4 spaces are separated of the parking lot by a gate and they are not available for the
Is this project a CS project?
posted by Lise Dannesboe on
We are wondering if our building can be certified with CS: The building is a renovation project in which a developer is fundamentally refurbishing the building base systems and building shell. The
Installing CO2 devices in non-densely occupied spaces
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Marina Andrade on
To comply if the requirements of this credit, could we installed CO2 devices, instead of outdoor airflow mesurement device, in non-densely occupied spaces?
"Preferred" Parking = reserved, cannot be used by others?
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Eric Thompson on
I have a project where we only have 3 parking spaces provided, resulting in a substantial reduction from the baseline. However, the client is reluctant to reserve these exclusively for carpools/va
Low-temperature chemical dishwashers
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Susan Di Giulio on
The kitchen consultant on our project has specified a Hobart LT-1 LOW-TEMP CHEMICAL DISHWASHER. While most Hobart products are E-Star, this one is not.
DES Option 2 – CHP with absorption chiller
NC-2009 EAc1:Optimize Energy Performanceposted by Qian Tang on
Hello, We are working on a LEED NC 2009 project with DES which the thermal plants consist except boilers and electric chillers also a cogenerator and an absorption chiller. We are thinking to follo
Footprint, at grade or below grade?
NC-2009 PIf2:Project Summary Detailsposted by Maria Porter on
Hi! I have a question similar to the one posted on Nov 18 2013 below.