Forum quick links
LEED Certified C&D sites
NC-2009 MRc2:Construction Waste Managementposted by Frances Stark on
Is there a comprehensive directory of all the LEED certified recycling sites by state (or otherwise categorized)? I would love to see it.
HET Retrofit
CI-2009 WEc1:Water Use Reductionposted by Matthew Catterall on
I've noticed that dual-flushflushometer retrofit kits are mentioned as a way to earn this credit on existing commercial toilets (rather than replace the entire toilet); however, there is no mention
Hydroponic based on FTE counts and IPM questions
Pilot-Credits SSpc82:Local food productionposted by Heather DeGrella on
I have two separate questions: 1. If we have a hydroponic green house, can we size it based on FTE counts and not the 1,500 sf minimum that is specific to hydroponics? 2.
Exam room sinks
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Laura Charlier on
Do sinks in exam rooms need to be included in the calculations? They are primarily used for handwashing. If so, are they entered as 'sinks' or 'lavatories' as the baseline? Thanks.
Construction Waste Diversion vs Material Re-Use
CS-2009 MRc2:Construction Waste Managementposted by Tim Gaidis on
Hi all, I'm working on a LEED-NC v3 major renovation project that has veered just below it's 50% MRc2 CWM target and have 2 questions below: Please note: We are pursuing 3 pts for the MRc1.1 Build
Charrette duration / delivery flexible?
NC-v4 IPc1:Integrative processposted by Vince Briones on
Has anyone had success with (2) 2-hr sessions being accepted as compliant (by GBCI) for the integrated design team charrette?
Actual building floor area and modeled floor area
NC-2009 EAp2:Minimum Energy Performanceposted by Haojie Wang on
I wonder if there is a rule on how much the difference between the actual and modeled floor area can be in LEED. Thanks
appendix of ieqp1 template vs 62MZcalc
NC-2009 IEQp1:Minimum IAQ Performanceposted by J.W. Shin on
Is there someone who experience any result differences between template and 62MZcalc? I put some data into 62MZcalc, then I tried to let them into template either. But, in my case, value of Ev wasn
Part-load efficiency (IEER)
NC-v4 EAp2:Minimum energy performanceposted by Charalampos Giannikopoulos on
According to Table 6.8.1B of ASHRAE 90.1.2010 it is required that the baseline HVAC systems serving spaces have a specific full-load and part-load efficiency.
Glare control
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Belén Valladares López on
Hi, We're working in a project trying to achieve this credit by option 3 (measurement). Our façade is an existing curtain wall. There are two different skins.