Hi all,I'm now working on a project under LEED certification that aims to achieve IEQc5.
Hazardous gas and chemical use areas are served by sprinkler system as a fire suppression system. If the the hard lid ceiling is drilled by the sprinkler's heads, can we assume that it is still able to demonstrate compliance with this credit?
Thanks.