EA p2

NC-2009 EAp2:Minimum Energy Performance
posted by  John Lee  on 

I haven't energy modeled yet and am reviewing someone else's work on EAp2.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Mar 11, 2015, 6:08 pm

Carbon Offset Program

CI-2009 EAc4:Green Power
posted by  Andreas Gyr  on 

I am working on a project that is performing it's own carbon offsets - ensuring that each investment in a carbon offset project has additionality, permanence, verifiability, etc.

3
Default Avatar
Architect LEED AP
Ingenieurbüro Anke Koch GbmH
LEEDuser Basic Member
5 thumbs up
Wed Mar 11, 2015, 1:55 pm

Epoxy Flooring with ZERO VOC

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Susan Morris  on 

I have a project with a large area of Epoxy Flooring, this epoxy contains 0% V.O.C.'s does it count as an inert material; or is testing required? Thank you

4
Wed Mar 11, 2015, 12:29 am

Transients vs. Retail?

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Kathryn West  on 

is there a definition for transients versus retail? We have a dining hall and aren't sure how to classify the students who enter the building for meals.

5
Tue Mar 10, 2015, 9:02 pm

How can I filled the LEED Online form

CS-2009 WEc3:Water Use Reduction
posted by  Somsak Jidmon  on 

My current CS Project using the water saving fixtures and saving the water up to 36% Reduction and our project will used the gray water from waste water treatment plant for all the flush fixtures w

2
Director - Green Building Advisory
Colliers International Ltd.
LEEDuser Basic Member
201 thumbs up
Tue Mar 10, 2015, 4:16 pm

System 8 VAV + PFP boxes

NC-2009 EAp2:Minimum Energy Performance
posted by  Giuseppina Amorusi  on 

Dear All, We are modelling a Baseline Building with System 8 “VAV + PFP boxes” using HAP by Carrier. We are wondering how to model the VAV + PFP boxes according to ASHRAE 90.1 Section 3.1.3.14.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Mar 10, 2015, 3:08 pm

Data Center Baseline systems

NC-v4 EAp2:Minimum energy performance
posted by  Vassil Vassilev  on 

Greetings everybody I'm modeling a datacenter and there are few issues about which I'm wondering how to proceed. The project consists of two building adhered to each other.

3
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Tue Mar 10, 2015, 2:03 pm

Dear Sirs,
We are consultants

NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfort
posted by  Maya Karkour  on 

Dear Sirs, We are consultants for a mall seeking LEED. Most of the spaces will be tenanted.

2
Default Avatar
President
Weatherby Design & Co. Engineers
LEEDuser Basic Member
67 thumbs up
Mon Mar 9, 2015, 3:45 pm

Reviewr's Comment is requesting labor and delivery

CI-2009 MRc4:Recycled Content
posted by  Sarah Thompson  on 

In all my 40 LEED projects I have never included labor and delivery to a material's cost total.

7
Default Avatar
LEEDuser Expert
472 thumbs up
Mon Mar 9, 2015, 2:57 pm

Min lux level for Project which has registered 5 months before

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  SSN Energy Model  on 

Hi Every one, Currently we are working for factory building project which has registered five months before under USGBC Rating system LEED 2009.

6
Mon Mar 9, 2015, 2:43 pm