EPA SmartWay Elite vs LEED

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Kristina Abrams  on 

Are the EPA SmartWay Elite requirements more or less stringent than the ACEEE Green Score requirements

3
Default Avatar
AIA, LEED AP BD&C
Ayers Saint Gross Architects
LEEDuser Basic Member
2 thumbs up
Mon Mar 23, 2015, 5:17 pm

Demolition of existing building

Schools-2009 MRc2:Construction Waste Management
posted by  Matthew Heaton  on 

I’ve encountered a differing of opinions regarding the Construction Waste management credit (MRc2) and could use some help.

3
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Mon Mar 23, 2015, 3:54 pm
7
Default Avatar
Green Building Partners Ltd
LEEDuser Basic Member
10 thumbs up
Mon Mar 23, 2015, 8:52 am

Eligible CxA for Design&Built project

NC-2009 EAc3:Enhanced Commissioning
posted by  Panupant Phapant  on 

Hi We are working on the project that the owner performs both design and construction activities.

2
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Sun Mar 22, 2015, 1:27 am

Forms Update

General forums
posted by  Rachael Vidulich  on 

I need to update my forms on LEED online as most of them are v01 and have "BETA" listed at the bottom.

3
Default Avatar
Project Engineer
The Augustine Company
LEEDuser Basic Member
0 thumbs up
Fri Mar 20, 2015, 7:48 pm

One Shift Peak FTE vs Daily Average

NC-2009 PIf3:Occupant and Usage Data
posted by  Tommy Linstroth  on 

Hi, I'm working on an outpatient clinic that has 1 shift of workers (8-4, 5 days/week). Per the owner, there are 52 FTE. Since there is only 1 shift, this is the peak and the daily average.

2
Default Avatar
Sustainability Architect
LEEDuser Basic Member
88 thumbs up
Fri Mar 20, 2015, 4:35 pm

cxa requirements

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  andres ramirez  on 

Hi I’m an arquitect and I just got the CPMP-commissioning certification from ASHRAE, I’ve been working already in 4 leed projects as a leed project manager.

3
Thu Mar 19, 2015, 10:16 pm

Energy And Water Data Release Form

General forums
posted by  Katherine Dubyk  on 

I'm working on a project with a government client who has opted to share infromation via Option 1, however are very perplexed as to why they are required to submit this additional form because they

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu Mar 19, 2015, 7:31 pm

Bike racks/storage for retail customers in mixed use building

CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Charles Nepps  on 

Our project is mixed use office and retail. Secure bike storage is provided in the parking garage for regular building occupants.

2
Thu Mar 19, 2015, 4:15 pm

Fire suppression system

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  FABIO VIERO  on 

Hi all,I'm now working on a project under LEED certification that aims to achieve IEQc5. Hazardous gas and chemical use areas are served by sprinkler system as a fire suppression system.

2
Thu Mar 19, 2015, 2:06 pm